Ballinleeny, (Coolrus & Kilmore townlands), Bruree
Proposed development
Extension of permission for planning ref. 17/199: involves the provision of an Asphalt Batching Plant including a bunded bitumen storage area (roof), 6 no. hoppers for insertion of raw material, Reclaimed Asphalt Pavement (RAP) system, conveyor belt system and 5 no. bitumen/fuel storage tanks. The proposed development includes the installation of a new Class 1 (full retention) petrol interceptor & the provision of an emissions stack measuring 22.8m in height (12.8 m above original ground level). The proposal is located within an existing operational quarry on a site measuring 0.82 Hectares and will avail of existing site infrastructure. The site will be accessed off the adjacent local road (LP-1545) via the existing quarry road
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 18 Jan 2024
Timeline
Application received
15 Nov 2023
Decision due
18 Jan 2024
Decision: conditional
17 Jan 2024
Site location with nearby applications
Can't object to this one
This type of application (extension of duration) doesn't take public submissions.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
an extension to the existing dwelling, a change from door to window on the front elevation, the installation of a new wastewater treatment system, an upgrade to existing vehicle entrance and all associated site works
construction of a new dormer bungalow dwelling house, detached garage, site entrance, driveway, proprietary wastewater treatment system, percolation area, and all associated site works
an existing 22m high telecommunications structure carrying antennas, communications dishes together with associated ground-mounted equipment within a 2.4 metre palisade fenced compound as previously granted under plan ref no. 12/93
involves the provision of an Asphalt Batching Plant including a bunded bitumen storage area (roof), 6 no. hoppers for insertion of raw material, Reclaimed Asphalt Pavement (RAP) system, conveyor belt system and 5 no. bitumen/fuel storage tanks. The proposed development includes the installation of a new Class 1 (full retention) petrol interceptor & the provision of an emissions stack measuring 22.8m in height (12.8 m above original ground level). The proposal is located within an existing operational quarry on a site measuring 0.82 Hectares and will avail of existing site infrastructure. The site will be accessed off the adjacent local road (LP-1545) via the existing quarry road