Coolrus, Bruree, Kilmallock Co. Limerick
Proposed development
Construction of a new dormer bungalow dwelling house, detached garage, site entrance, driveway, proprietary wastewater treatment system, percolation area, and all associated site works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 27 Jan 2022
- Residential units
- 1
- Floor area
- 203.4 m²
Timeline
Application received
12 Oct 2021
Council asked for further information
3 Dec 2021
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
22 Dec 2021
Decision due
27 Jan 2022
Decision: conditional
27 Jan 2022
Grant issued
2 Mar 2022
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
extension of permission for planning ref. 17/199: involves the provision of an Asphalt Batching Plant including a bunded bitumen storage area (roof), 6 no. hoppers for insertion of raw material, Reclaimed Asphalt Pavement (RAP) system, conveyor belt system and 5 no. bitumen/fuel storage tanks. The proposed development includes the installation of a new Class 1 (full retention) petrol interceptor & the provision of an emissions stack measuring 22.8m in height (12.8 m above original ground level). The proposal is located within an existing operational quarry on a site measuring 0.82 Hectares and will avail of existing site infrastructure. The site will be accessed off the adjacent local road (LP-1545) via the existing quarry road
the construction of building for use for motorcycle sales, repair, storage & maintenance, and new vehicular entrance and all ancillary works
construction of a slatted shed, feed passage, ancillary concrete and associated site works
development consisting of construction of building for use for motorcycle sales, repair, storage & maintenance and all ancillary works
involves the provision of an Asphalt Batching Plant including a bunded bitumen storage area (roof), 6 no. hoppers for insertion of raw material, Reclaimed Asphalt Pavement (RAP) system, conveyor belt system and 5 no. bitumen/fuel storage tanks. The proposed development includes the installation of a new Class 1 (full retention) petrol interceptor & the provision of an emissions stack measuring 22.8m in height (12.8 m above original ground level). The proposal is located within an existing operational quarry on a site measuring 0.82 Hectares and will avail of existing site infrastructure. The site will be accessed off the adjacent local road (LP-1545) via the existing quarry road