Ballinleeny, (Coolrus & Kilmore townlands), Bruree Co Limerick
Proposed development
Involves the provision of an Asphalt Batching Plant including a bunded bitumen storage area (roof), 6 no. hoppers for insertion of raw material, Reclaimed Asphalt Pavement (RAP) system, conveyor belt system and 5 no. bitumen/fuel storage tanks. The proposed development includes the installation of a new Class 1 (full retention) petrol interceptor & the provision of an emissions stack measuring 22.8m in height (12.8 m above original ground level). The proposal is located within an existing operational quarry on a site measuring 0.82 Hectares and will avail of existing site infrastructure. The site will be accessed off the adjacent local road (LP-1545) via the existing quarry road
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 19 Dec 2017
Timeline
Application received
3 Mar 2017
Council asked for further information
26 Apr 2017
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
22 Nov 2017
Decision due
19 Dec 2017
Decision: conditional
18 Dec 2017
Grant issued
15 Aug 2018
Appeal decided: withdrawn (ABP-300735-18)
Not available
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
an extension to the existing dwelling, a change from door to window on the front elevation, the installation of a new wastewater treatment system, an upgrade to existing vehicle entrance and all associated site works
extension of permission for planning ref. 17/199: involves the provision of an Asphalt Batching Plant including a bunded bitumen storage area (roof), 6 no. hoppers for insertion of raw material, Reclaimed Asphalt Pavement (RAP) system, conveyor belt system and 5 no. bitumen/fuel storage tanks. The proposed development includes the installation of a new Class 1 (full retention) petrol interceptor & the provision of an emissions stack measuring 22.8m in height (12.8 m above original ground level). The proposal is located within an existing operational quarry on a site measuring 0.82 Hectares and will avail of existing site infrastructure. The site will be accessed off the adjacent local road (LP-1545) via the existing quarry road
construction of a new dormer bungalow dwelling house, detached garage, site entrance, driveway, proprietary wastewater treatment system, percolation area, and all associated site works
an existing 22m high telecommunications structure carrying antennas, communications dishes together with associated ground-mounted equipment within a 2.4 metre palisade fenced compound as previously granted under plan ref no. 12/93