Coolrus, Bruree, Kilmallock Co.Limerick
Proposed development
An existing 22m high telecommunications structure carrying antennas, communications dishes together with associated ground-mounted equipment within a 2.4 metre palisade fenced compound as previously granted under plan ref no. 12/93
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 31 Aug 2017
Timeline
Application received
7 Jul 2017
Decision due
31 Aug 2017
Decision: conditional
29 Aug 2017
Grant issued
5 Oct 2017
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
an extension to the existing dwelling, a change from door to window on the front elevation, the installation of a new wastewater treatment system, an upgrade to existing vehicle entrance and all associated site works
extension of permission for planning ref. 17/199: involves the provision of an Asphalt Batching Plant including a bunded bitumen storage area (roof), 6 no. hoppers for insertion of raw material, Reclaimed Asphalt Pavement (RAP) system, conveyor belt system and 5 no. bitumen/fuel storage tanks. The proposed development includes the installation of a new Class 1 (full retention) petrol interceptor & the provision of an emissions stack measuring 22.8m in height (12.8 m above original ground level). The proposal is located within an existing operational quarry on a site measuring 0.82 Hectares and will avail of existing site infrastructure. The site will be accessed off the adjacent local road (LP-1545) via the existing quarry road
1) the retention of the rear ground floor extension as constructed, 2) the retention of the rear first floor attic extension which includes altered roof profile as constructed, 3) the retention of altered front elevations including one roof light, 4) the retention of the front porch and 5) all associated site works
a new roof with an increase in height to accommodate a first floor extension to the existing bungalow
involves the provision of an Asphalt Batching Plant including a bunded bitumen storage area (roof), 6 no. hoppers for insertion of raw material, Reclaimed Asphalt Pavement (RAP) system, conveyor belt system and 5 no. bitumen/fuel storage tanks. The proposed development includes the installation of a new Class 1 (full retention) petrol interceptor & the provision of an emissions stack measuring 22.8m in height (12.8 m above original ground level). The proposal is located within an existing operational quarry on a site measuring 0.82 Hectares and will avail of existing site infrastructure. The site will be accessed off the adjacent local road (LP-1545) via the existing quarry road