Templerainey Ballymoney and Killiskyduff, Arklow, Co. Wicklow
Proposed development
A 10 year permission for the construction of an electrical substation and associated 110kV and MV ancillary infrastructure required to connect ground mounted soclar PV generation to the electricity transmission system; energy storage modules; lightning protection masts; Perimeter security fencing; Access tracks; undergorund cabling; temporary construction compound; tree plating; drainage infrastructure and all associated ancillary site development works
- Applicant
- Not published
- Authority
- Wicklow County Council
- Decision due
- 3 May 2022
Timeline
Application received
9 Mar 2022
Decision due
3 May 2022
Decision: conditional
10 Oct 2023
Grant issued
16 Nov 2023
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
installation of ESB Networks' compact modular MV EGIP substation to facilitate the connection of the consented Templerainey East Solar Farm (planning ref: 16/1285) to the electrical distribution system
amend the design of the approved development (Planning Reference: 19/627 and ABP-305289-19) which comprises consent for a Solar Farm within a site area of 19 hectares consisting of solar photovoltaic panels covering an area of up to 9.8ha on ground mounted steel frames, 1 no. on-site substation; 3 no. inverter/transformer stations, underground cables and ducts, boundary security fence, new internal tracks, CCTV cameras and all associated site services within the townland of Ballymoney, near Arklow, Co. Wicklow. Planning permission was sought for a period of 10 years. Proposed amendments include (1) relocation of part of the internal access track, and (2) a gate will be added along the access track
a 10 year permission for the construction of an energy storage facility within a total site area of 0.48 hA to include containerised battery storage modules on concrete support structures, electrical transformer / inverter stations, associated electrical ducting / cabling, security fencing and CCTV security monitoring system, lightning protection poles and ancillary equipment
a 10 year permission for the construction of an energy storage facility within a total site area of 0.48 hA to include containerised battery storage modules on concrete support structures, electrical transformer / inverter stations, associated electrical ducting / cabling, security fencing and CCTV security monitoring system, lightning protection poles and ancillary equipment
a 12.3 square metre plant room, a 30.0 square metre shed as built, also retention for change of use from attic to 33.7 square metre storage area in attic of house, retention of rooflights, and retention for minor elevation changes to door and windows to house and garage from previous planning permission (952472) and all associated siteworks
a 12.3 square metre plant room, a 30.0 square metre shed as built, also retention for change of use from attic to 33.7 square metre storage area in attic of house, retention of rooflights, and retention for minor elevation changes to door and windows to house and garage from previous planning permission (95/2472) and all associated site works