White House, Ballinacarrig, Brittas Bay
Proposed development
Works completed at White House, an existing detached 2-storey dwelling (with converted attic), comprising the revised location of a single storey living room extension to the southern gable-end, revised positioning of new velux rooflights to the existing roof to the front elevation, and revisions to the window openings to the detached single storey garage structure incorporating a new home office, and alterations to the porch roof at the main entrance to the front elevation, all previously granted Permission under Planning Reg Ref 20/781, together with a new garden shed located in the front garden
- Applicant
- Not published
- Authority
- Wicklow County Council
- Decision due
- 4 Apr 2023
Timeline
Application received
8 Feb 2023
Decision due
4 Apr 2023
Decision: conditional
31 Mar 2023
Grant issued
16 May 2023
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
construction of a new garage & car port to the front of the existing single storey dwelling
extensions and alterations to existing dwelling house and effluent disposal system to current EPA requirements and associated site works
change of use of existing farm buildings to provide four self-catering holiday accommodation units. The development will consist of a renovation and a change of use to existing farm structures providing (2 No. two bed units) and (2 No. one bed units) alterations to farmyard enclosures to provide car parking / amenity areas. A packaged effluent disposal system with mechanical aeration and polishing filter to current EPA standards together with all associated site development works
change of use of existing farm buildings to provide four self-catering holiday accommodation units. The development will consist of a renovation and a change of use to existing farm structures providing (2 No. Two Bed Units) and (2 No. One bed Units) alterations to farmyard enclosures to provide car parking / amenity areas. A packaged effluent disposal system with mechanical aeration and polishing filter to current EPA standards together with all associated site development works
a farm diversification tourism accommodation & open farm project incorporating a full masterplan & landscaping scheme, incl: (1) Open farm visitor areas inc. farm sheds incl. 50sq.m petting shed, pens, paddocks, play areas, garden, connecting to existing/proposed accommodation by a ‘Farm Link Trail’, assoc. fences/gates; (2) Guest facilities farm yard cluster incl: i. Entry Building (total 44sq.m) incl. farm shop & coffee dock & reception; ii. Communal shelter (88sq.m) meeting area for picnics/BBQs; iii. Guest amphitheatre; & iv. Farm food building (100sq.m) incl. kitchen, catering & self-catering area, & communal dining areas with assoc. storage & toilets; (3) 12 no. hobbit type subterranean glamping pods; (4) Part demolition/re-use/part renovation & extension of existing farmhouse & buildings to create 4 no. holiday units (1 No. 1 Bed, 2 No. 2-Beds & 1 No. 3 Bed), with a 1st. fl. balcony; (5) 4 no. shepherd huts sited around a swale SuDS pond accessed by walkways; (6) Upgrading of existing farm entrances onto the L5605 with walls/pillars and security gates to serve scheme vehicles, pedestrians & cyclists; (7) New sections of internal road, footpaths (incl. “Farm Link Trail”), vehicle & bike parking areas, incl. disabled & EV charging spaces (incl. connections to existing Millrace Holiday Park); (8) New 24PE packaged effluent disposal system with mechanical aeration and polishing filter to current EPA standards to serve the north end of the site; (9) Connections to existing water & wastewater services (incl. to existing 160PE effluent disposal system per permission ref: 18/555) to the south side of the site; (10) Permanent indigenous landscape buffer with path to Potters River to be retained & improved to IFI standards; (11) Bin stores; (12) Solar panels to buildings; & (13) All associated site works. The planning application is accompanied by an Appropriate Assessment Screening Report
a). A sunroom located on front/south elevation with 24m² floor area. b). A lean-to structure located on south/west elevation covering 6m² area