Walterstown, Hollywood, Co. Wicklow
Proposed development
Extraction of sand and gravel materials from the site. The proposed site area is 8.44 hectares, and the proposed extraction area is 5.52 hectares. The proposed development includes a surface mounted weighbridge, wheel wash, portacabin office, canteen and welfare facilities with all site ancillary works, and fencing. It is proposed to extract 50,000 tonnes per annum for a period of 10 years. An Environmental Impact Assessment Report (EIAR) and a Nutura Impact Statement(NIS) have been submitted in respect of the proposed development
- Applicant
- Not published
- Authority
- Wicklow County Council
- Decision due
- 6 Aug 2023
Timeline
Application received
7 Dec 2022
Decision due
6 Aug 2023
Decision: refused
2 Aug 2023
Appeal decided: conditional (ABP-317874-23)
22 Jan 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
demolish existing two storey dwelling and to build a replacement two storey dwelling with single storey annexes to side & rear, to upgrade existing septic system to current EPA guidelines and for all associated site works
The development will consist of the extraction of sand and gravel materials from the site. The proposed site area is ca. 20.308 hectares and the proposed extraction area is ca. 17.79 hectares. The proposed development also includes a surface mounted weighbridge, a wastewater treatment system and percolation area, portacabin office, canteen and welfare facilities on site together with all site ancillary works, drainage, wheel wash and fencing. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development.
extraction of sand and gravel materials from the site. The proposed site area is ca. 20.308 hectares, and the proposed extraction area is ca. 17.79 hectares. The proposed development also includes a surface mounted weighbridge, a wastewater treatment system and percolation area, portacabin office, canteen and welfare facilities on site together with all site ancillary works, drainage, wheel wash and fencing. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development.
extraction of sand and gravel materials from the site. The proposed site area is ca 20.308 hectares and the proposed extraction area is ca 17.79 hectares. The proposed development also includes a portacabin office and canteen on site together with all site ancillary works, drainage, wheel wash and fencing. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development
single storey extension to the side of the existing single storey dwelling and for all associated site works