Sheepwalk, Arklow, Co. Wicklow
Proposed development
Single storey dwelling with well, new vehicular entrance, new treatment system and percolation area and all ancillary site works
- Applicant
- Not published
- Authority
- Wicklow County Council
- Decision due
- 19 Jun 2019
- Residential units
- 1
- Floor area
- 162 m²
Timeline
Application received
25 Apr 2019
Decision due
19 Jun 2019
Decision: conditional
12 Jun 2019
Grant issued
23 Jul 2019
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
retention of extensions and front elevation to house as constructed
to construct a grain store, concrete aprons & all associated site works in my farmyard
the importation of material to in-fill and re-contour the subject site. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the Site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 2.43ha of the total site. The 2.43ha. is divided into 3 distinct phases - Phase 1 is 0.78ha, Phase 2 is 0.77ha and Phase 3 is 0.88ha. A fill plan has been drawn up for the importation of 18,200tonnes to fill Phase 1, 23,085tonnes to fill Phase 2, and 42,721tonnes to fill Phase 3, equating to a total of 84,006tonnes of soil and stone. Permission is being sought for a 5-year period and will be subject to a waste facility permit
proposed dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
erection of a ground floor extension (incorporating a domestic garage/store), first floor extension and to carry out alterations to existing dwelling house. Permission is also sought for a new replacement wastewater treatment system to current EPA standards and to decommission the existing system on site and to carry out associated ancillary site works
the construction of a bungalow with garage, new vehicular entrance and driveway, new effluent treatment system to current EPA standards and all ancillary site works