Ballycooleen, Avoca, Co. Wicklow
Proposed development
Demolish a 29 sqm extension to the side of the existing dwelling along with a 56 sqm outbuilding and erect a 122m extension to the side of the existing 55 sqm original dwelling, block up the existing vehicular entrance and construct a new vehicular entrance with improved sightlines along with all associated site development works
- Applicant
- Not published
- Authority
- Wicklow County Council
- Decision due
- 19 Jan 2019
Timeline
Application received
11 May 2018
Council asked for further information
25 Jun 2018
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
14 Dec 2018
Decision due
19 Jan 2019
Decision: conditional
15 Jan 2019
Grant issued
27 Feb 2019
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
section 42 - extension of appropriate period - 16/176 - 10 year permission for the construction of a Solar PV Energy development within a total site area of up to 13.76 ha to include one single storey electrical substation building, electrical transformer / inverter station modules, solar PV panels ground mounted on steel support structures, access roads, fencing and associated electrical cabling, ducting and ancillary infrastructure
retention of extensions and front elevation to house as constructed
to construct a grain store, concrete aprons & all associated site works in my farmyard
the importation of material to in-fill and re-contour the subject site. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the Site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 2.43ha of the total site. The 2.43ha. is divided into 3 distinct phases - Phase 1 is 0.78ha, Phase 2 is 0.77ha and Phase 3 is 0.88ha. A fill plan has been drawn up for the importation of 18,200tonnes to fill Phase 1, 23,085tonnes to fill Phase 2, and 42,721tonnes to fill Phase 3, equating to a total of 84,006tonnes of soil and stone. Permission is being sought for a 5-year period and will be subject to a waste facility permit
proposed dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
erection of a ground floor extension (incorporating a domestic garage/store), first floor extension and to carry out alterations to existing dwelling house. Permission is also sought for a new replacement wastewater treatment system to current EPA standards and to decommission the existing system on site and to carry out associated ancillary site works