Applegreen Motorway Service Area, Kiltimon, Cullenmoe
Proposed development
Modifications will consist of additional parking to now provide a total of 123 no car parking spaces, 13 no HGV spaces, 6 no coach spaces and 9 no motorbike spaces to serve the existing facility. Ground floor extensions to existing services building (c61 sqm in total) to provide additional seating and relocated kids play area. Provision of an external play area. Alterations to eastern elevation and entrance lobby, associated site development works, services provision, and landscaping works including modifications to on site wastewater treatment facility and provision of retaining walls.
- Applicant
- Not published
- Authority
- Wicklow County Council
- Decision due
- 5 Dec 2017
Timeline
Application received
11 Jul 2017
Council asked for further information
31 Aug 2017
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
8 Nov 2017
Decision due
5 Dec 2017
Decision: conditional
27 Nov 2017
Grant issued
17 Jan 2018
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
extensions and alterations to existing dwelling house which measures 48.4 sq. m. proposed works consisting of construction of an extension measuring 76 sq. m bringing the house total area to 124.5 sq. m, relocation of front door, provision of external insulation to existing house, removal of chimney from existing house and the upgrading of wastewater treatment system to EPA standards including ancillary works
SUBMISSIONS TO BE MADE DIRECTLY TO An Coimisiun Pleanala - Strategic Infrastructure Development Planning Application to An Coimisiun Pleanala for permission for the establishment and operation of a soil recovery facility. The facility will import approximately 2,160,000 tonnes imported inert waste, principally from development sites, which will be used to progressively infill a deep sided valley and raise ground levels up to a height of approximately 57mOD to tie in with surrounding land ground levels. The proposed development will take place within a total site area of 17.08 hectares (ha). The infill area extent is approximately 14 ha. The infilled valley will be progressively restored to agricultural grassland / hedgerow habitat, similar to that which existed prior to the proposed development. The lands will be returned to agricultural use. The following temporary facilities will be installed and maintained during the life of the soil recovery facility: office and welfare facilities; weighbridge and associated weighbridge cabin; 1 no. wheel wash, 1 no. spray system wheel wash; 6 no. parking bays; 2 no. waste inspection bays and 1 no. bunded waste quarantine area; hardstanding area (vehicle movement and storage); and, surface water drainage infrastructure from hard standing and discharge to ground (including 2 no. interceptors and 2 no. soakaways), an internal access road, internal haul roads (constructed from recycled aggregates where available), security features including security gates and fencing. The existing land entrance located on R772 will be upgraded and will be retained following the completion of the proposed development. Hedgerow removed from the field boundary opposite the existing land entrance to facilitate sightlines will be replanted following the completion of the proposed development.
refurbishment and alteration to existing dwelling; construction of a part single, part two storey extension to the rear of existing dwelling; demolition of the agricultural building; reinstatement of outhouse for incidental use; improvements to the existing site entrance; new sewage treatment system together with all necessary ancillary works to facilitate this development
for - demolition of existing dwelling and farm buildings; - construction of a new, part single, part two storey dwelling replacing existing house to be demolished; - new sewage treatment system together with all necessary ancillary works
change of use of garage to accommodation use and the retention of ancillary buildings comprising studio with basement storage and fuel storage buildings
dwelling, modifications to existing entrance, creation of a laneway beside existing dwelling, wastewater treatment unit, soil polishing filter, connection to water mains and associate works