5 - 8 Fortlands Road, Ballaghaderreen, County Roscommon
Proposed development
Permission to construct a terrace of 4 No.3 bed houses and connect to existing services on Sites at
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Roscommon County Council
- Decision due
- 28 Jul 2024
- Residential units
- 4
- Floor area
- 487 m²
Timeline
Application received
19 Apr 2024
Council asked for further information
13 Jun 2024
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
1 Jul 2024
Decision due
28 Jul 2024
Decision: conditional
25 Jul 2024
Grant issued
2 Sept 2024
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Permission for development which will consist of: Construction of a single storey extension to rear of the existing separator room together with all ancillary site works and services (The activity at Aurivo Dairy Ingredients, Ballaghaderreen, is subject to an Integrated Pollution Control Licence (IPC). There is an existing licence in place for the facility, Licence No P0802-03. Aurivo Dairy Ingredients at Dublin Road, Ballaghaderreen is lower tier Seveso site, and subject to Major Accident Hazards (COMAH) Regulations) at
Permission is sought for Grid System Services Limited, applying for a 10-year permission to develop an Energy Storage System, which will connect to the adjoining ESB Tonroe 110kV Electricity Substation. The proposed development will have a projected life span of 35 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c. 2.33 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 44 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); up to 11 transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure at
Permission is sought for Grid System Services Limited, applying for a 10 year permission to develop an Energy Storage System, which will connect to the adjoining ESB Tonroe 110kV Electricity Substation on land at Ballyoughter, Ballaghaderreen, County Roscommon. The proposed development will have a projected life span of 35 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c.2.33 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 44 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); up to 11 transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure at
Permission for construction of a plant room, switch room, and condenser platform together with all ancillary site works and services (The activity at Aurivo Dairy Ingredients, Ballaghaderreen, is subject to an Integrated Pollution Control Licence (IPC). There is an existing licence in place for the facility, Licence No. P0802-03, Aurivo Dairy Ingredients at Dublin Road, Ballaghaderreen is lower tier Seveso site, and subject to Major Accident Hazards (COMAH) Regulations) at
Permission for the construction of a two storey extension to the Abbeyfield Hotel EROC Centre, to provide additional accommodation with a single storey corridor link to the existing EROC Centre, an Astro Turf Pitch, a Play Area and all associated site development works at Abbeyfield Hotel EROC Centre,
Planning Permission for the construction of a two storey extension to the Abbeyfield Hotel EROC centre to provide additional accommodation with a single storey corridor link to the existing EROC Centre, an Astro Turf Pitch, a Play Area and all associated site development works at