Longford, Castlerea, Co. Roscommon
Proposed development
Permission for development which will consist of a new dwelling, gated entrance, 2 no. garages and suitable wastewater treatment system with polishing filter and all ancillary site works at
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Roscommon County Council
- Decision due
- 18 Nov 2021
- Residential units
- 1
- Floor area
- 673.6 m²
Timeline
Application received
9 Jul 2021
Council asked for further information
2 Sept 2021
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
22 Oct 2021
Decision due
18 Nov 2021
Decision: conditional
18 Nov 2021
Grant issued
23 Dec 2021
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Permission for the development consisting of the upgrade of the existing Castlerea (Longford Springs) Water Treatment Plant (WTP), located within the townland of Longford, County Roscommon. As part of the works, it is proposed to improve the treatment performance and operational reliability of the existing Castlerea WTP. Upgrade works at the Castlerea WTP shall consist of the following: • Raw Water Intake and Storage Works, including: o Replacement of the existing raw water sump and associated pumping equipment. o Raw water storage tank • Water Treatment Works, including: o Construction of a new treatment building housing two treatment streams comprising adsorption clarification and filtration processes. • Chemical Treatment Works, including: o Coagulant dosing systems. o Chlorine dosing systems. o Polymer dosing systems. • Treated Water Storage and Transfer Works, including: o Construction of a new clear water tank. o Provision of a high lift pump station building/kiosk, including pumping equipment and space for chemical mixing and dosing systems. • Modification of the existing washwater system. • Decommissioning Works, including: o Existing raw water intake sump and pumping station o Existing flash mixing tank o Existing flocculation tanks. o Existing filtered water tank. o Existing chemical treatment container. • Ancillary Site Works, including general groundworks, site clearance, drainage works, ducting, pipework, chambers, internal site roadways / hardstanding areas, fencing and landscaping at
Permission for development consisting of the upgrade of the existing Castlerea (Longford Springs) Water Treatment Plant (WTP). As part of the works, it is proposed to improve the treatment performance and operational reliability of the existing Castlerea WTP. Upgrade works at the Castlerea WTP shall consist of the following: • Raw Water Intake and Storage Works, including: - Replacement of the existing raw water sump and associated pumping equipment. - Raw water storage tank • Water Treatment Works, including: - Construction of a new treatment building housing two treatment streams comprising adsorption clarification and filtration processes. • Chemical Treatment Works, including: - Coagulant dosing systems. - Chlorine dosing systems. - Polymer dosing systems. • Treated Water Storage and Transfer Works, including: • Construction of a new clear water tank. • Provision of a high lift pump station building/kiosk, including pumping equipment and space for chemical mixing and dosing systems. • Modification of the existing washwater system. • Decommissioning Works, including: • Existing raw water intake sump and pumping station • Existing flash mixing tank • Existing flocculation tanks. • Existing filtered water tank. • Existing chemical treatment container. • Ancillary Site Works, including general groundworks, site clearance, drainage works, ducting, pipework, chambers, internal site roadways / hardstanding areas, fencing and landscaping at
Permission to construct a dwelling house and domestic garage, wastewater treatment system along with associated siteworks at
Permission to construct a dwelling house and domestic garage, wastewater treatment system along with associated siteworks at
Permission for a ten year planning permission is being sought for the proposed development which will consist of the following elements: the installation and operation of 1 no. battery energy storage system compound containing battery energy storage containers, 1 no. electrical substation and compound, connected to the national grid system via c. 50m of underground cable to the ESB Castlerea 38kV substation, electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road, associated ancillary site development, landscaping and reinstatement works. The operational lifespan of the development will be 35 years. The site of the proposed development has a total area of 0.644 hectares at
for development consisting of a new dwelling, gated entrance, garage, stables and suitable wastewater treatment system with polishing filter and all ancillary site works at