Cuilmore, Bealnamulla, Athlone
Proposed development
The development will consist of the removal of the existing lean-to single storey extension to the rear of the existing dwelling house, the construction of a south facing single storey extension and a north/west facing single storey extension to the existing dwelling house, the provision of a new conventional septic tank system and percolation area, together with all associated siteworks at
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Roscommon County Council
- Decision due
- 15 Mar 2017
- Residential units
- 1
- Floor area
- 89 m²
Timeline
Application received
19 Jan 2017
Decision due
15 Mar 2017
Decision: conditional
8 Mar 2017
Grant issued
13 Apr 2017
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Retention permission is sought for retention of domestic outbuilding (garage/storage) and alterations to front elevation windows of extension granted under planning permission reference 2100(A)/87 at
Permission for a 10-year planning permission for development at this site at Esker, Cuilmore, Cloonrallagh, Corraree and Ballygatta, Newtown, Ardnanure, Curraghaleen, Cloonakille, Rooskagh, Bellanamullia and Monksland Co. Roscommon. This development will consist of the construction of a Solar PV development, an on-site 38kV Substation and Battery Energy Storage System, along with associated 38kV underground cable connecting the proposed Solar PV Farm and BESS to the existing Athlone ESB 110kV Substation and all associated works on a total area of ca. 116 hectares. The Solar Farm, 38kV substation and Battery Energy Storage System will be located on a site that is ca. 110ha and located within the townlands of Esker, Cuilmore, Cloonrallagh, Corraree and Ballygatta, Co. Roscommon and will consist of: I. Solar PV panels laid out in arrays across the Site of ca. 110ha on ground-mounted frames; II. 48 BESS units; III. 15 transformer units; IV. One 38kV substation building (13.7m x 7.3m); V. Underground electrical and communications cabling within private lands and minor local road; VI. Polemounted security cameras; VII. Perimeter security fencing (2m high) and security gates; VIII. Three new entrances and upgrade works of one existing entrance; IX. Two primary temporary construction compounds and three satellite temporary construction compounds; X. 16 new drainage ditch crossings and one upgraded culvert; XI. Internal access tracks between the solar arrays and the site entrances; and, XII. All associated ancillary site development, landscaping and reinstatement works. The 38kV underground cabling will be located on a site that is ca. 6ha and will traverse the townlands of Monksland, Bellanamullia, Cloonakille, Rooskagh, Curraghaleen, Cloonrollagh, Ardnanure, Newtown and Cuilmore, Co. Roscommon and will consist of: I. Ca. 9.56km of underground 38kV cable, three power cables and one fibre communications, beneath private and public roads (L76371, L76374, L76394, L2047, L2026, L7577, L75771 and R362); II. 12 Joint Bays; III. Two HDD Crossings; IV. Associated works including road carriageway passing places; and, V. All associated ancillary works above and below ground. The operational lifespan of the development will be 40 years, and planning permission is requested for this duration. A Natura Impact Statement accompanies the planning application. This development is covered by the provisions of the Renewable
Permission for a period of 5 years to construct and complete a Solar PV Energy Development with a total site area of 77.76 hectares, to include: a single storey electrical substation building, inverter substations, modules, solar PV ground mounted on support structures, temporary construction compounds, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works relating to the access of the site (The solar farm will be operational for 35 years) at
for development of a new dwelling with connection to services, domestic garage, entrance, proprietary wastewater treatment system with soil polishing filter and all ancillary site works at
for development of a new dwelling with connection to services, domestic garage, entrance, proprietary wastewater treatment system with soil polishing filter and all ancillary site works at
for development of a new dwelling with connection to services, entrance, proprietary wastewater treatment system with soil polishing filter and all ancillary site works at