KINNITY CASTLE HOTEL, CASTLETOWN KINNITY, BIRR CO OFFALY
Proposed development
DEVELOPMENT CONSISTING OF THE ALTERATION AND MATERIAL CHANGE OF USE OF EXISTING COACH HOUSE AND STABLE OUTBUILDINGS TO THE REAR OF KINNITTY CASTLE HOTEL, TO A PROPOSED CRAFT DISTILLERY AND VISITOR CENTRE. THE ALTERED BUILDINGS WILL CONTAIN SPACE FOR THE FOLLOWING: DISTILLERY PROCESS, BOTTLING, STORAGE, RETAIL AREA, TASTING AREA AND BAR, CRAFT WORKSHOPS, ANCILLARY STAFF AREAS AND TOILETS. THE WORKS WILL INCLUDE REPAIRS AND ALTERATIONS TO THE EXISTING BUILDINGS AND SITE DEVELOPMENT WORKS INCLUDING NEW COURTYARD SCREEN WALL, LANDSCAPING TO COURTYARD, FOUL AND SURFACE WATER DRAINAGE. THE PROPOSED DEVELOPMENT IS WITHIN THE CURTILAGE OF A PROTECTED STRUCTURE.
- Applicant
- Not published
- Authority
- Offaly County Council
- Decision due
- Not available
Timeline
Application received
20 Sept 2019
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
(A) AS BUILT RAFT FOUNDATION FOR PROPOSED RESIDENTIAL UNIT AND (B) PLANNING PERMISSION TO ERECT STEEL FRAMED RESIDENTIAL UNIT ON EXISTING RAFT FOUNDATION, INSTALL EFFLUENT TREATMENT UNIT WITH SOIL POLISHING FILTER ALL ANCILLARY SITE WORKS
CONSTRUCTION OF A 30M HIGH MULTI-USER LATTICE TELECOMMUNICATIONS STRUCTURE, CARRYING ANTENNA AND DISHES ENCLOSED WITHIN A 2.4M HIGH PALISADE FENCE COMPOUND INCLUDING NEW ACCESS TRACK TOGETHER WITH ASSOCIATED GROUND EQUIPMENT AND ASSOCIATED SITE WORKS
DEVELOPMENT THAT WILL CONSIST OF THE ALTERATION AND MATERIAL CHANGE OF USE OF EXISTING COACH HOUSE AND STABLE OUTBUILDINGS TO THE REAR OF KINNITTY CASTLE HOTEL, TO A PROPOSED CRAFT DISTILLERY AND VISITOR CENTRE. THE ALTERED BUILDINGS WILL CONTAIN SPACE FOR THE FOLLOWING: DISTILLERY PROCESS, BOTTLING, STORAGE, RETAIL AREA, TASTING AREA AND BAR, CRAFT WORKSHOPS, ANCILLARY STAFF AREAS AND TOILETS. THE WORKS WILL INCLUDE REPAIRS AND ALTERATIONS TO THE EXISTING BUILDINGS AND SITE DEVELOPMENT WORKS INCLUDING NEW COURTYARD SCREEN WALL, LANDSCAPING TO COURTYARD, FOUL AND SURFACE WATER DRAINAGE. THE PROPOSED DEVELOPMENT CONSISTS OF WORK TO A PROTECTED STRUCTURE