GARBALLY, BLUEBALL, TULLAMORE
Proposed development
THE CONSTRUCTION OF A SINGLE STOREY DWELLING HOUSE, EFFLUENT TREATMENT SYSTEM WITH A SOIL POLISHING FILTER, ENTRANCE, WELL, AND ALL ASSOCIATED SITE WORKS
- Applicant
- Not published
- Authority
- Offaly County Council
- Decision due
- 20 Jul 2017
- Residential units
- 1
- Floor area
- 145 m²
Timeline
Application received
26 May 2017
Decision due
20 Jul 2017
Decision: refused
12 Jul 2017
Appeal decided: refused (PL19.249027)
5 Feb 2018
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
A.erect a 24m high lattice telecommunication structure with associated dishes, antenna and supporting equipment together with access track, and to remove the existing 18m high lattice telecommunication within the same compound, and B.Retention permission to retain the existing telecommunications compound and associated ground-based equipment and fencing
THE CONSTRUCTION OF A PROPOSED TWO-STOREY DWELLING,DOMESTIC OUTBUILDING,, A PROPOSED WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER, A PROPOSED BORED WELL, ALL ASSOCIATED SITEWORKS, INCLUDING A PROPOSED SITE ENTRANCE
THE DEMOLITION OF THE EXISTING TWO-STOREY DWELLING, WITH THE CONSTRUCTION OF A PROPOSED TWO STOREY DWELLING WITH BASEMENT, MODIFICATIONS TO THE EXISTING OUTBUILDING TO INCLUDE RE-ROOFING, THE INSTALLATION OF ROOFLIGHTS, ADJUSTMENTS TO WINDOWS AND DOOR OPENINGS AND ALL INTERNAL MODIFICATIONS. PERMISSION IS ALSO SOUGHT FOR WORKS TO EXISTING SITE ENTRANCES AND BOUNDARIES TO IMPROVE SIGHTLINE VISIBILITY TO BOTH, THE DECOMMISSIONING OF THE EXISTING SEPTIC TANK AND THE PROPOSED INSTALLATION OF A PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITEWORKS
PROPOSED INCREASED FOOTPRINT TO THE EXISTING 2-STOREY DETACHED DWELLING; PROPOSED EXTENSIONS RANGING FROM SINGLE STOREY TO THE NORTH/NORTH-EAST ELEVATION AND 3-STOREY EXTENSIONS TO ALL OTHER ELEVATIONS; INTERNAL AND EXTERNAL MODIFICATIONS TO THE EXISTING DWELLING TO FACILITATE THE DEVELOPMENT; PROPOSED INCREASE IN THE OVERALL HEIGHT OF THE EXISTING HOUSE WITH THE CONSTRUCTION OF A NEW ROOF TO TIE INTO THE PROPOSED EXTENSION. THE PROPOSED DEVELOPMENT ALSO SEES THE CONSTRUCTION OF A NEW ROOF AND ASSOCIATED EXTERNAL WALL AND EXTERNAL ELEVATIONAL TREATMENTS INCLUDING NEW WINDOWS AND DOORS TO FACILITATE THE PROPOSED EXTENSION. PERMISSION IS ALSO SOUGHT FOR REPLACEMENT OF THE EXISTING ON-SITE WASTEWATER TREATMENT SYSTEM WITH A NEW PROPRIETY WASTEWATER TREATMENT SYSTEM AND ALL ANCILLARY SITE WORKS. NO CHANGES ARE PROPOSED TO THE EXISTING SITE BOUNDARIES OR VEHICULAR ENTRANCE TO THE SITE
AN EXTENSION TO THE SIDE AND REAR OF THE EXISTING HOUSE AND ALL ANCILLARY SITE WORKS
THE CONSTRUCTION OF A SINGLE-STOREY EXTENSION TO THE NORTH AND EXTENSIONS TO THE SOUTH, EAST AND WEST OF EXISTING HOUSE. THE PROPOSED DEVELOPMENT ALSO SEES THE CONSTRUCTION OF A NEW ROOF, NEW EXTERNAL WALL TREATMENTS, NEW WINDOWS, AND NEW EXTERNAL DOORS WITH A CONNECTION TO NEW PROPRIETY SEWAGE TREATMENT SYSTEM AND ALL ANCILLIARY SITE WORKS