Doogary, Tydavnet, Co. Monaghan
Proposed development
Permission to retain two storey extension to existing bungalow, domestic garage and exit on to public road
- Applicant
- Not published
- Authority
- Monaghan County Council
- Decision due
- 30 Jul 2024
- Residential units
- 1
- Floor area
- 1 m²
Timeline
Application received
5 Jun 2024
Decision due
30 Jul 2024
Decision: conditional
30 Jul 2024
Grant issued
3 Sept 2024
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
permission to retain alterations/extension to 1 No. poultry house together with all ancillary structures and site works (including revisions to site layout) associated with the above development on an existing poultry farm
permission to construct 1 no. Biomass storage shed including integrated boiler and associated plant room, together with all ancillary structures (to include wood pellet silo) and all associated site works. This application relates to a development, which is for the purposes of an activity requiring a Licence under IV of the Environmental Protection Agency (Licensing) Regulations 1994 to 2013
permission to 1) retain as constructed changes to floor plans and elevations to previously approved dwelling ref P16/105 2) Remove condition No. 2 from planning ref P16/105 3) Retain location and complete modifications to previously approved domestic garage approved under P16/105, together with all ancillary site works.
permission to demolish two out-buildings and to construct a new portal framed shed alongside the existing silage pit with a projecting roof to the front to provide a covered yard and to construct a new roof/canopy over the existing silage slab/pit. Further works to include the construction of a new two storey domestic shed and a canopy structure for clothes drying for use ancillary to the existing dwelling house including all site works, boundary treatment and hardstanding's.