Lisdrumdoagh, Monaghan, Co. Monaghan
Proposed development
Permission to construct a broiler type poultry house, together with all ancillary structures including vertical meal bin & underground washings tank, together with associated ancillary site works & new site access from public road. Significant further information relates to the inclusion of an appropriate assessment screening report.
- Applicant
- Not published
- Authority
- Monaghan County Council
- Decision due
- 13 Oct 2020
Timeline
Application received
27 May 2020
Council asked for further information
21 Jul 2020
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
16 Sept 2020
Decision due
13 Oct 2020
Decision: conditional
13 Oct 2020
Appeal decided: refused (ABP-308616-20)
24 Mar 2021
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
planning permission to construct a poultry house, for laying-hens, with detached manure store, vertical meal bins, washings tank & other associated ancillary site works including alterations to existing site access from public road
permission for retention of existing dwellinghouse and wastewater treatment and their position on site where these vary from the granted planning file No 7138, retain sunroom and kitchen extension along with separate utility room and coal/fuel store along with adjoining bedroom accessed from courtyard. Retain shed buildings adjoining dwellinghouse along with trailer unit used for storage. Retain entrances and accesses to the site, dwelling house and sheds along with all walls, fences, gates, walls, hedges ramps, steps and surface finishes. Retain pumphouse and fuel storage tanks along with parking area for one truck unit. Retain site boundary and fence positions. Retain agricultural gate to small front field/access to wastewater area. Retain disused pumphouse. Removal of 2n trailer units, Removal of truck parking area and associated fuel storage tanks, closing up of roadside access with new fence and hedge. Replacement /Proposed new wastewater treatment system with associated percolation area. Significant information included visual inspection of existing wastewater treatment system report and Site characterisation assessment report.
a ten year planning permission is being sought for the proposed development which will consist of the following elements: the installation and operation of 1no. battery energy storage system compound containing battery energy storage containers, 1no. electrical substation and compound, connected to the national grid system via c. 100m of underground cable to the ESB Lisdrum 38kV substation, electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road, associated ancillary site development, landscaping and reinstatement works. The operational lifespan of the development will be 35 years. The site of the proposed development has a total area of 1.03 hectares
retention permission for single storey extension comprising of domestic home office and lounge area to rear of existing dwelling & first floor attic space extension comprising of bedroom, washroom & den area together with all ancillary works
permission for proposed single-storey extension to side of existing 2-storey house and all associated works
Permission for development consisting of the installation of additional electrical equipment in the ESB substation to facilitate the connection of the battery storage facility (Planning Ref 18/5). This will include a 100k V Busbar extension, a 110k V transformer bat and a 110kV coupler bay (a previously granted under Planning Ref 20/143). The extension of the existing ESB substation control building to facilitate the new connection. The installation of approx. 210m of 110kV underground ducting cables between the ESB substation and the battery storage site. The extension of the existing access road and all associated ancillary infrastructure required for the project.