Lisdrumdoagh, Rackwallace, Monaghan
Proposed development
Permission (10 year permission) to construct an energy storage facility within a total site area of up to 1.1HA, to include one single storey electrical substation building and electrical compound, electrical transformer/inverter station modules, containerised battery storage modules on concrete support structures, access tracks, associated electrical ducting, cable racking and cabling, security fencing and CCTV security monitoring system, lightning protection poles, communications equipment and ancillary infrastructure.
- Applicant
- Not published
- Authority
- Monaghan County Council
- Decision due
- 24 Apr 2018
Timeline
Application received
4 Jan 2018
Council asked for further information
27 Feb 2018
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
28 Mar 2018
Decision due
24 Apr 2018
Decision: conditional
24 Apr 2018
Grant issued
28 May 2018
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
planning permission to construct a poultry house, for laying-hens, with detached manure store, vertical meal bins, washings tank & other associated ancillary site works including alterations to existing site access from public road
permission for retention of existing dwellinghouse and wastewater treatment and their position on site where these vary from the granted planning file No 7138, retain sunroom and kitchen extension along with separate utility room and coal/fuel store along with adjoining bedroom accessed from courtyard. Retain shed buildings adjoining dwellinghouse along with trailer unit used for storage. Retain entrances and accesses to the site, dwelling house and sheds along with all walls, fences, gates, walls, hedges ramps, steps and surface finishes. Retain pumphouse and fuel storage tanks along with parking area for one truck unit. Retain site boundary and fence positions. Retain agricultural gate to small front field/access to wastewater area. Retain disused pumphouse. Removal of 2n trailer units, Removal of truck parking area and associated fuel storage tanks, closing up of roadside access with new fence and hedge. Replacement /Proposed new wastewater treatment system with associated percolation area. Significant information included visual inspection of existing wastewater treatment system report and Site characterisation assessment report.
a ten year planning permission is being sought for the proposed development which will consist of the following elements: the installation and operation of 1no. battery energy storage system compound containing battery energy storage containers, 1no. electrical substation and compound, connected to the national grid system via c. 100m of underground cable to the ESB Lisdrum 38kV substation, electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road, associated ancillary site development, landscaping and reinstatement works. The operational lifespan of the development will be 35 years. The site of the proposed development has a total area of 1.03 hectares
permission to construct a detached bungalow type dwelling house, with proprietary wastewater treatment system & other associated ancillary site works. Access from public road will be via modification / relocation of existing domestic access (to become a shared access)
Permission for development consisting of the installation of additional electrical equipment in the ESB substation to facilitate the connection of the battery storage facility (Planning Ref 18/5). This will include a 100k V Busbar extension, a 110k V transformer bat and a 110kV coupler bay (a previously granted under Planning Ref 20/143). The extension of the existing ESB substation control building to facilitate the new connection. The installation of approx. 210m of 110kV underground ducting cables between the ESB substation and the battery storage site. The extension of the existing access road and all associated ancillary infrastructure required for the project.
Permission to consist of alterations to the development of a Battery Storage Facility which was previously granted permission by Monaghan County Council (Planning Register 18/5). The development comprises the construction of a battery energy storage facility to include one single storey electrical compound, containerised battery storage modules on concrete support structures, electrical transformer/inverter station modules, electrical ducting, cable racking and cabling, access tracks, security fencing and CCTV security monitoring system, lighting protection poles, communications equipment and ancillary infrastructure. The alterations to the original permission include an amended application site boundary of 1.474Ha, a reduction in the number of containerised battery modules from 58 down to 10, reduction in the number of associated inverters and transformers, new internal road configuration, reconfiguration and reorientation of the control building, additional ancillary electrical infrastructure, regrading of site levels to accommodate excess soils arising from excavation works, a landscape berm and other enabling works