Crosses (ED Rackwallace), Monaghan, Co. Monaghan
Proposed development
Permission to construct 1 no. pig house, together with all ancillary structures (to include meal bin (s) and soiled water tank(s)) and ancillary site works (to include upgraded site entrance). An Environmental Impact Assessment Report (E.I.A.R.) has been submitted with this application.
- Applicant
- Not published
- Authority
- Monaghan County Council
- Decision due
- 9 Feb 2018
Timeline
Application received
7 Dec 2017
Decision due
9 Feb 2018
Decision: conditional
8 Feb 2018
Grant issued
13 Mar 2018
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
planning Permission for a development which will consist of the following: •New poultry layer house together with 2no. meal storage bins attached to the northern side of the existing facility previously granted planning permission on Pl. Ref. No. 10/337. •relocate existing covered manure storage/loading area and conveyor equipment, •underground washdown water storage tank (5000 gallons), •a new site entrance inwards only and the existing entrance will become exit only, •together with all associated site service details, landscaping and all ancillary site works. This application relates to a development, which is for the purposes of an activity requiring a Licence under part IV of the Environmental Protection Agency (Licensing) Regulations 1994 to 2013.An Environmental Impact Assessment Report (E.I.A.R.) will be submitted with this planning application
Permission to construct a new two storey dwelling house & detached domestic double garage, install new mechanical effluent treatment system, new subsoil percolation area, construct new domestic entrance together with all ancillary site works
permission for development works on low lying lands to include (a) Upgrading of existing entrance to facilitate the works (b) The stripping back of existing topsoil material (c) The deposit of inactive or inert waste such as subsoil (approximately 42000 tonnes) to increase level of land (d) The covering of deposited inactive or inert waste with topsoil material to make good land for the purpose of agriculture.