Kilbreckstown, Stamullen, Co. Meath
Proposed development
EXTENSION OF DURATION OF PLANNING PERMISSION AA160519 - A solar PV energy development of maximum export capacity 4MW, to include one ESB networks substation building with a height of up to 4m, three electrical transformer stations with a height of up to 3.2m, site access roads and solar PV panels mounted on steel support structures 2.5m in height, other ancillary equipment and associated cabling, ducting, fencing and CCTV
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- 12 Jan 2021
Timeline
Application received
9 Nov 2020
Decision due
12 Jan 2021
Decision: unconditional
8 Jan 2021
Site location with nearby applications
Can't object to this one
This type of application (extension of duration) doesn't take public submissions.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the development will consist of 1) Construction of 1no. single storey dwelling. 2) New vehicular site entrance to public road. 3) New wastewater treatment system & soil polishing filter, private well, and all associated site works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
the development will consist of 1) Construction of 1no. single storey dwelling. 2) New vehicular site entrance to public road. 3) New wastewater treatment system & soil polishing filter, private well, and all associated site works
the development will consist of: The provision of renewable energy consisting of a new solar panel array to the west of the existing priory. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
the development will consist of: The provision of a new solar panel array to the West of the existing priory
the development will consist of: The provision of a new solar panel array to the West of the existing priory
the development will consist of: The provision of a new solar panel array to the West of the existing priory