Boliden Tara Mines, Knockumber, Navan Co. Meath
Proposed development
A new portacabin structure on a concrete base, connection to existing services, and all ancillary site development works
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- 7 Jun 2022
Timeline
Application received
13 Apr 2022
Decision due
7 Jun 2022
Decision: conditional
2 Jun 2022
Grant issued
15 Jul 2022
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
The development will consist of; 1. Demolition of the existing dwelling house. 2. Erect new site signage. 3. Alterations to existing entrance to include new piers and an electric gate and all associated site works.
The development will consist of the installation of a modular substation including civil engineering works to construct the foundation along with an access route for ESBN vehicles.
Planning permission for development at Kells Road, Navan, Co. Meath, C15E9H9. The development will consist of; 1. Demolition of the existing dwelling house. 2. Erect new site signage. 3. Alterations to existing entrance to include new piers and an electric gate and all associated site works.
the development consists of external elevational signage on the unit’s front/south-eastern elevation including changes to elevational treatment and window graphics, external elevational signage on the side/south-western elevation, trolley safety signage at the existing trolley bays, disabled and parent & child parking signage at the existing parking spaces, and all associated site works necessary to facilitate the development
the development will consist of the installation of a modular substation including civil engineering works to construct the foundation along with an access route for ESBN vehicles. The modular substation dimensions are 4.7m L x 2.7m W x 3m H. Note: Building Control Officers in two other planning authorities have confirmed the modular substation is not considered a building therefore Article 7 of the Building Control Regulations 1997 - 2025 as the works referred to are not a building or works to which the Building Regulations 1997 – 2024 apply
construction of proposed commercial storage unit, installation of proposed wastewater treatment system and percolation area, including all ancillary site works