Muff, Nobber, Co Meath
Proposed development
The construction of an agricultural underpass linkage area under existing public road (cul de sac) and all site works. Significant further information/revised plans submitted on this application
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- 31 Jul 2022
Timeline
Application received
25 Feb 2022
Council asked for further information
20 Apr 2022
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
20 Jun 2022
Decision due
31 Jul 2022
Decision: conditional
28 Jul 2022
Grant issued
8 Sept 2022
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (agricultural building) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
Side/Front extension to existing dwelling house, and all associated site works
The development will consist of a new proposed two storey dwelling, new detached single storey garage and associated carport, use of the existing agricultural entrance as a domestic entrance, new wastewater treatment system and soil polishing filter together with all associated site development works.
The development will consist of the importation and insertion of c.143,826 tonnes of uncontaminated soil and stone as a non-waste by product over a six year period, not exceeding 25,000 tonnes/annum, to improve 7.34 hectares of agricultural lands where: •The further use of the soil and stone is certain and will be used to recontour and improve the agricultural lands; •The soil and stone can be used directly without further processing. •The soil and stone will be an integral part of a production process i.e. soil will be excavated, moved to facilitate site development in accordance with Article 27 by a material producer or with the expressed written consent of a material producer and will be notifiable to the EPA as a by - product prior to its use on lands. •The proposed further use of the soil and stone fulfils all relevant product, environmental and health protection requirements for the specific use and will not lead to overall adverse environmental or human health impacts. On site equipment includes: •Existing site wheel wash; •Existing mobile portacabin welfare facilities; •Existing material inspection and quarantine area; There is no planned removal of hedge line vegetation on the perimeter of the site.
the importation and insertion of c.100,000 tonnes of excavation spoil, over a five-year period and not exceeding 25,000 tonnes in a single year. The excavation spoil comprises of natural materials of clay, silt, sand, gravel or stone beneficial for agricultural purposes. On site equipment includes: existing site wheel wash, exiting mobile portacabin welfare facilities, existing material inspection and quarantine area. There is no planned removal of hedge line vegetation on the perimeter of the site. Significant Further Information / Revised plans submitted on this application.
new entrance, permission to deposit clean subsoil and topsoil on site and all ancillary site works (previous planning application number KA/60008. Significant further information/revised plans submitted on this application