Kilmainham, Kells, Co Meath
Proposed development
To construct a part two storey/part single storey type dwelling, detached domestic garage, install waste water treatment system and percolation area and form a new entrance from existing access lane together with all associated site works
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- 4 Nov 2021
- Residential units
- 1
- Floor area
- 239.06 m²
Timeline
Application received
10 Sept 2021
Decision due
4 Nov 2021
Decision: conditional
3 Nov 2021
Grant issued
16 Dec 2021
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (new house) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
RED III APPLICATION- A solar farm and energy storage compound with a total area of circa 137 hectares. The proposed development will consist of a solar farm comprising of c. 462,660 sq.m of solar photovoltaic panels on ground mounted frames, associated string inverters mounted to rear of panels and 41 no. single storey electrical transformer stations and 1 no. medium voltage control/switching substation. The energy storage compound will consist of 70 no. containerised energy storage modules and associated plant and equipment, 35 no. transformers and 5 no. auxiliary transformers, 2 no. spare parts containers and 1. no. medium voltage control/switching substation. The overall project will also consist of underground electrical ducting and cabling within the development site and within the R163 and R147 public roads, Horizontal Directional Drill (HDD) crossing of the Blackwater River, temporary construction compounds, security fencing, CCTV, access tracks, landscaping, drainage and all ancillary development works and apparatus necessary to facilitate the proposed development. Construction and operational access will be via 2 no. existing entrances from the R147 and R163 which will be upgraded. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. The NIS includes an assessment of the grid connection for the solar farm project comprising a 110kV electricity substation and ‘loop-in / loop-out’ grid connection cabling to the existing Arvagh/Navan 110kV overhead line which will be the subject of an application to An Coimisiún Pleanála and is situated in the townland of Kilmainham, Kells, Co. Meath. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
EXTENSION OF DURATION OF PLANNING PERMISSION KA200067 - Planning permission to construct a two-storey dwelling house, domestic garage, new entrance off existing access laneway & sewerage treatment system & associated works
EXTENSION OF DURATION OF PLANNING PERMISSION REF NO: KA191576 - a two storey dwelling house, domestic garage, new entrance off existing access laneway and to install a sewerage treatment system with percolation area together with all associated works.
a 10 Year Planning Permission for a solar farm and energy storage compound with a total area of circa 164 hectares in the townlands of Fyanstown, Hurdlestown, Kilmainham, Rossmeen and Sedenrath, Kells, County Meath. The proposed development will consist of a solar farm comprising of c. 960,000 sq.m of solar photovoltaic panels on ground mounted frames, associated string inverters mounted to rear of panels and 48 no. single storey electrical transformer stations and 1 no. medium voltage control/switching substation. The energy storage compound will consist of 70 no. containerised energy storage modules and associated plant and equipment, 35 no. transformers and 5 no. auxiliary transformers, 2 no. spare parts containers and 1. no. medium voltage control/switching substation. The overall project will also consist of underground electrical ducting and cabling within the development site and within the R163 and R147 public roads, Horizontal Directional Drill (HDD) crossing of the Blackwater River, temporary construction compounds, security fencing, CCTV, access tracks, landscaping, drainage and all ancillary development works and apparatus necessary to facilitate the proposed development. Construction and operational access will be via 3 no. existing entrances from the R147 and R163 which will be upgraded. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. Significant Further Information/Revised Plans submitted on this application
a 10 Year Planning Permission for a solar farm and energy storage compound with a total area of circa 164 hectares in the townlands of Fyanstown, Hurdlestown, Kilmainham, Rossmeen and Sedenrath, in County Meath. The proposed development will consist of a solar farm comprising of c. 960,000 sq.m of solar photovoltaic panels on ground mounted frames, associated string inverters mounted to rear of panels and 48 no. single storey electrical transformer stations and 1 no. medium voltage control/switching substation. The energy storage compound will consist of 70 no. containerised energy storage modules and associated plant and equipment, 35 no. transformers and 5 no. auxiliary transformers, 2 no. spare parts containers and 1. no. medium voltage control/switching substation. The overall project will also consist of underground electrical ducting and cabling within the development site and within the R163 and R147 public roads, Horizontal Directional Drill (HDD) crossing of the Blackwater River, temporary construction compounds, security fencing, CCTV, access tracks, landscaping, drainage and all ancillary development works and apparatus necessary to facilitate the proposed development. Construction and operational access will be via 3 no. existing entrances from the R147 and R163 which will be upgraded. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application
permission for (a) change of use from existing Farm Building to domestic dwelling (b) demolish existing single storey extension to front of building (c) construct a single store extension to rear & side of existing structure, (d) install new proprietary wastewater treatment system & all associated site development works