CARHA, BONNICONLON, BALLINA
Proposed development
CONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE, ON-SITE WASTEWATER TREATMENT SYSTEM TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKS
- Applicant
- Not published
- Authority
- Mayo County Council
- Decision due
- 27 Oct 2019
- Residential units
- 1
- Floor area
- 271 m²
Timeline
Application received
24 Jul 2019
Council asked for further information
16 Sept 2019
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
30 Sept 2019
Decision due
27 Oct 2019
Decision: conditional
23 Oct 2019
Grant issued
27 Nov 2019
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
permission for change of use of existing vacant school building to dwelling house with integrated independent living unit & to include alterations to the existing layout & elevations, relocation of site entrance and to carry out all ancillary site works.
1. Retain existing 22.50sqm front Extension with stone façade finish. 2. Retain existing 16 sqm Sunroom to West Elevation 3. Retain existing 6.50 sqm Porch to Rear Elevation 4. Retain existing 87.50 sqm Attic Conversion including 2no. dormer windows to Front Elevation and 5no. velux windows to Rear Elevations. 5. Retain existing Property Entrance from Public Road. 6. Retain partly constructed 76.50 sqm Domestic Garage and complete with slate roof and roller shutter door to front elevation. 7. Retain partly constructed 26 sqm fuel store and complete with roller shutter door to front and corrugated lean two type roof. 8. Retain existing 83 sqm general storage shed with lean two type corrugated roof. 9. Retain all ancillary works to site. 10. Install 7 PE Mechanical Aeration Unit with distribution chamber with 5no. 9m long percolation trenches.
1. Retain existing 22.50sqm front Extension with stone façade finish. 2. Retain existing 16 sqm Sunroom to West Elevation 3. Retain existing 6.50 sqm Porch to Rear Elevation 4. Retain existing 87.50 sqm Attic Conversion including 2no. dormer windows to Front Elevation and 5no. velux windows to Rear Elevations. 5. Retain existing Property Entrance from Public Road. 6. Retain partly constructed 76.50 sqm Domestic Garage and complete with slate roof and roller shutter door to front elevation. 7. Retain partly constructed 26 sqm fuel store and complete with roller shutter door to front and corrugated lean two type roof. 8. Retain existing 83 sqm general storage shed with lean two type corrugated roof. 9. Retain all ancillary works to site. 10. Install 7 PE Mechanical Aeration Unit with distribution chamber with 5no. 9m long percolation trenches.
1. Retain existing 22.50sqm front Extension with stone façade finish. 2. Retain existing 16 sqm Sunroom to West Elevation 3. Retain existing 6.50 sqm Porch to Rear Elevation 4. Retain existing 87.50 sqm Attic Conversion including 2no. dormer windows to Front Elevation and 5no. velux windows to Rear Elevations. 5. Retain existing Property Entrance from Public Road. 6. Retain partly constructed 76.50 sqm Domestic Garage and complete with slate roof and roller shutter door to front elevation. 7. Retain partly constructed 26 sqm fuel store and complete with roller shutter door to front and corrugated lean two type roof. 8. Retain existing 83 sqm general storage shed with lean two type corrugated roof. 9. Retain all ancillary works to site. 10. Install 7 PE Mechanical Aeration Unit with distribution chamber with 5no. 9m long percolation trenches.
Construction of a Bungalow Dwelling, Effluent Treatment System and together with site access & all associated site works.
construction of a slatted shed with underground slurry storage tank along with all associated site works