Longford Forest, Ballymahon, Co. Longford
Proposed development
Development which will consist of 1) inflatable floating play area on existing lake to include inflatable water slides, inflatable platforms, inflatable logs and climbing frames 2) pre-fabricated changing facility structure to include showers and toilets, 3) all ancillary site works (COVID 19b)
- Applicant
- Not published
- Authority
- Longford County Council
- Decision due
- 18 Jul 2020
Timeline
Application received
1 Apr 2020
Decision due
18 Jul 2020
Decision: conditional
10 Jul 2020
Grant issued
12 Aug 2020
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the following: 1. Retention permission for amendments to the external cladding elevations of the tower platform for the new aerial zipline attraction, as constructed, which differ from the elevations approved under Planning Permission Ref. No. 26/60018. 2. Planning permission for the construction of a 25.5 sq.m extension to the existing Action Challenge Hut, together with all associated site development and ancillary works
the proposed development will consist of the installation of a new adventure nets attraction comprising suspended rope and net structures within the existing forest setting, the provision of an electrical distribution board and IT cabinet on a concrete base, lighting infrastructure, and all associated ancillary site works
for the following: 1. Retention permission for amendments to the external cladding elevations of the tower platform for the new aerial zipline attraction, as constructed, which differ from the elevations approved under Planning Permission Ref. No. 26/60018. 2. Planning permission for the construction of a 25.5 sq.m extension to the existing Action Challenge Hut, together with all associated site development and ancillary works
the construction of a single-storey timber canopy for kit-on/kit-off facilities, the installation of a tower platform for a new aerial zipline attraction and associated ancillary site works
the construction of six (6) arrival kiosks, and all associated works
the construction of preinsulated storage tank adjacent to existing tanks in the technical services compound with a volume capacity of 500m3, a reinforced concrete base, retaining wall, and all associated services