Moore St., Cappamore, Co. Limerick.
Proposed development
The construction of 2 dwelling houses, each with a vehicular entrance off existing private passageway (which is accessed off Moore St.), connection to main services together with all associated site works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 12 Mar 2026
- Residential units
- 2
- Floor area
- 426 m²
Timeline
Application received
3 Nov 2025
Council asked for further information
18 Dec 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
13 Feb 2026
Decision due
12 Mar 2026
Decision: conditional
27 Feb 2026
Grant issued
8 Apr 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
1. Demolition of existing sub-standard commercial building and associated site works, along with site clearance. 2. Construction of new GP Surgery building. 3. Alterations to the existing vehicular access, including the provision of new revised entrance and exit arrangements onto the R505 Regional Road. 4. The development also includes infrastructural works to accommodate development to include: footpaths, parking, lighting, signage, solar panels to roof, landscaping, attenuation garden ecosystem, surface water drainage along with connection to public foul sewer and all associated site works
completion of a one and half storey rear extension to existing dwelling and the demolition of former side and rear single storey extensions. Planning permission is also sought for alterations and modifications to existing dwelling, for the removal of existing septic tank, and the installation of wastewater treatment and percolation area and all associated site works
installation of a standalone Pod structure, 21 square metres, as a sensory room and safe space ancillary to the existing Cappamore Community Hall, together with all associated site works
a) construct a standalone single storey building for use within the existing campus, with the new building to be constructed in two phases b) to demolish an existing classroom block after the new building is fully constructed c) to demolish 2no. sheds and 2no. prefabricated units d) to construct a new site entrance and access road, connect to existing campus services along with associated site works
all works already executed, including: Removal of heating system and some finishes throughout, including fireplace elements, timber floors, skirting boards, dado rails and other works as described in the drawings, Removal of sub-floor timber joists to 3 ground floor rooms, Removal of 3 timber sash windows to ground floor of return to rear, Removal of oil fired central heating system. Permission for development is being sought for other works including: Re-opening of an existing doorway to south and existing window to east, Insertion of new internal doorway to ground floor toilet, Refinishing of slate roof to return to rear, Provision of new timber subfloor to 3 ground floor rooms, General upgrade works to include internal insulation, replacement of PVC windows and external doors with timber goods, insertion of oil fired central heating system with associated goods, insertion of new rainwater drainage routes from outlets to soak-pit, modernisation of the electrical and plumbing system within the dwelling, and all other associated site and general works above and below ground. The works are in the curtilage of a Protected Structure (RPS 1053, NIAH 21806029)