Ballybrown, Clarina, Co. Limerick
Proposed development
The construction of a rear extension to existing retail shop providing for an increase in ground floor store room area together with provision of first floor office/meeting room accommodation to include all necessary internal alterations and all associated site development works and permission for the retention of existing external laundromat unit facility and a dog washing facility and associated site works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 26 Jan 2024
Timeline
Application received
19 Oct 2023
Council asked for further information
11 Dec 2023
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
21 Dec 2023
Decision due
26 Jan 2024
Decision: conditional
25 Jan 2024
Grant issued
27 Feb 2024
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the construction of a dormer dwelling house, garage, entrance, connect to public services and associated site works
(a) change of design of building from that previously granted under Planning Reference 22/624 (ABP – 317437-23), (b) proposed change of use of part of ground floor from Medical use to retail use all with existing connections to public utility services and all required associated site works
the demolition of the existing commercial building and the construction of 4 no. 3 storey retail / apartment buildings with a total of 8 no. retail units and 16 no. apartments. Each block will contain 2 no. retail units and 4 no. 3 bed apartments along with hardstand parking areas, 2 no. EV charging spaces, open spaces, foul and sewer connections and all associated site works
a dormer type extension to the side of the house
the renovation of and construction of a one and a half storey extension to the rear and side of existing dwellinghouse, including raising roof height of existing house together with all associated site works
The development works will consist of: (a) Extension of the existing embankment on the landowner's side. (b) Construction of a shared raised footpath and cycleway, with a macadam-finished surface. The shared path will extend from the roundabout and continue around the bend onto the L-1403 local road. (c) Provision of an uncontrolled crossing on the L-1403 at the end of the proposed footway. (d) Fencing along walkway with timber posts and tensioned mesh fencing on the land-owner's side. (e) Relocation of the existing open drain where required, and piping under access ways into private property. (f) Minor repair works to the N69/L-1403 junction. (g) Accommodation works for affected landowners