Coolaboy, Dromcollogher, Co. Limerick
Proposed development
The change of use of 4 No. adjacent single storey dwellings to now form part of the existing Respite Care Centre including all necessary internal and external modifications. Permission is also sought to carry out part demolition of the existing main building entrance area, including the construction of alterations and extensions to the Respite Care Centre. Permission is also sought for any necessary modifications to the existing site entrance to facilitate ease of access for emergency services, the provision of a revised car-parking layout including that of the adjacent Cois na hAbhainn housing estate and all associated site development works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 23 Nov 2023
Timeline
Application received
29 Sept 2023
Decision due
23 Nov 2023
Decision: conditional
17 Nov 2023
Grant issued
19 Dec 2023
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the demolition of existing attached outbuildings, the part demolition of; including alterations and extension to the existing dwelling. The proposal will provide for incorporating an independent living unit within the existing dwelling and part extension. The new extension towards the rear will become the main part of the dwelling. Both are to be linked internally. Permission is also sought to install a new on-site effluent treatment system including all associated site development works
construction of a loose straw bedded shed, feed passage and concrete apron
a new footbridge over river with edge protection & connecting paved link between the church grounds & the town park lands & all associated site works (The proposed works are in the Curtilage of a protected structure)
Uisce Éireann intends to apply for a 10-year planning permission to construct a new wastewater treatment plant (WwTP) at Coolaboy, Dromcollogher, Co. Limerick. The Proposed Development will comprise the construction of a new WwTP to provide treatment capacity for a population equivalent (PE) of 1,350 (10 years) and 1,550 (30 years). The wastewater will be treated and discharged via an outfall pipe into the River Deel at a location approximately 6.5 kilometres to the northwest of the WwTP. The outfall pipe will be located primarily in public roads in the townlands of Coolaboy, Mundellihy, Ballinlongig, Cloonmore and Tulligmacthomas. The existing WwTP will be decommissioned and demolished upon completion of the Proposed Development. The Proposed Development will comprise: i) Development of a new preliminary wastewater treatment plant including infrastructure such as bypass channels and screens; grit and fats, oils, greases (FOG) removal plant; storm water overflow tank; sludge drying reed beds; flash mixer chamber; return liquor pumping station facilities; caustic and ferric dosing storge tanks; flow to full treatment (FFT) pumping station; final settlement tank flow split chamber; 2 no. final clarifiers; sludge draw off chamber (return-activated sludge and waste-activated sludge pumping station); static mixer; wash water pumping station; tertiary disk filter; and final effluent pumping station. ii) Development of an ESB sub-station, control building, and fuel tank. iii) Provision of approx. 54m of new gravity sewer to direct flows to the new WwTP. This will replace an existing combined sewer overflow which will be decommissioned after the process switchover. iv) Provision of adequate site lighting, access gates, access stairs, walkways, car parking and electric charging facilities, and site boundary hedging and fencing. v) Provision of photovoltaic (PV) panels on the site of the existing WwTP following its decommissioning. vi) Provision of site drainage infrastructure including a hydrocarbon interceptor, construction of outfall pipe along public roads, and headwall in Tulligmacthomas. vii) Realignment and widening of existing site entrance, including provision of a new access road into the site and a bridge within the site. viii) All hard and soft landscaping throughout the site, and all associated and ancillary site works. The Proposed Development will be accompanied by a Natura Impact Statement (NIS)
a new public walkway link between the church carpark & town park lands & associated site works
construction of an extension to the North Eastern (Entrance) Elevation, to include a revision to the entrance and also the elevational treatment