Ardnamoher, Galbally, Co. Limerick
Proposed development
The construction of entrance, dwelling house, domestic garage, waste water treatment system, percolation area and associated site works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 18 Sept 2022
- Residential units
- 1
- Floor area
- 211.9 m²
Timeline
Application received
25 Jul 2022
Decision due
18 Sept 2022
Decision: conditional
13 Sept 2022
Grant issued
18 Oct 2022
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
extending and renovating existing dwelling and for permission to demolish existing Sun Room and for retention permission to retain domestic shed and retention permission to retain domestic garage and associated site works
(a) The change of use of a former private residential cottage to a short term residential rental unit,, (b) The change of use of two no. former agricultural structures to short term rental units, (c) The provision of a small new extension to form an internal link between the roadside former farm structure and the cottage, (d) renovation works to the courtyard, (e) the provision of a Secondary Treatment System and soil polishing filter serving all three structures and all ancillary site works, The Cottage is a recorded protected structure
a boiler house to the side of existing dwelling and permission for the demolition of boiler house and for the construction of an extension to the rear of the existing two-storey dwelling
boiler house to the side of existing dwelling and permission for the demolition of boiler house and for the construction of an extension to the rear of the existing two-storey dwelling
an extension to the rear of existing two storey dwelling
construction of a cubicle shed with loose area and underground effluent tanks and all associated site works