O'Connor Park, Reerasta North, Ardagh Co. Limerick
Proposed development
The construction of 10 no. housing units in addition to ancillary site works comprising of a new vehicular junction (with the R521), an access road, services, footpaths, parking, boundary treatment and landscaping units
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 18 Aug 2022
- Residential units
- 1
- Floor area
- 1 m²
Timeline
Application received
24 Jun 2022
Decision due
18 Aug 2022
Decision: conditional
29 Aug 2022
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
(a) Change of design to clubhouse design as granted under planning reference no. 23/60625, incorporating a lobby entrance (25 sq/m) to the ground floor with revised internal ground floor layout, (b) the construction of a first floor over ground (285 sq/m) consisting of an open plan gymnasium and a multipurpose/meeting room, with revised roof detail, (c) Revised car parking layout to that granted under 23/60625 to accommodate the above proposed revisions, with no further alterations to site entrance or drainage layout
the removal of 1 no. prefabricated building and demolition of single storey shelter. The development will include the construction of a new single storey extension to the front and side of the existing school buildings. It will comprise of 2 no. additional needs classrooms with ancillary spaces and boiler room. Also an accessible parking space and set down arrangement at the main entrance including a new entrance and boundary wall and all associated site works
upgrading and utilising existing vehicular entrance, the decommissioning of existing septic tank system and the installation of a new packaged wastewater unit and percolation area and all associated site works
a change of use of a portion of the existing light industrial building to 9 no. residential apartment units and associated site works. The development will consist of changes to elevations to accommodate new external windows and doors and internal alterations to construct 3 no. 1 bed apartments at first floor level and 1 no. 2 bed apartment and 5 no. 1 bedroom apartments at ground floor level and all associated site works
the construction of a Two Storey Detached Dwellinghouse, Connection To The Mains Services, Demolition of Existing Derelict House, Including All Ancillary Site Works
a change of use of a portion of the existing light industrial building to 9 no. residential apartment units and associated site works. The development will consist of changes to elevations to accommodate new external windows and doors, Internal alterations to construct 3 no. 1 bed apartments at first floor level and 1 no. 2 bed apartment and 5 no. 1 bedroom apartments at ground floor level and all associated site works