Pound Street, Cloontemple, Ballingarry Co. Limerick
Proposed development
Demolition of 2no. existing terraced dwelling houses and construction of 2no. replacement terraced dwelling houses, boundary walls and all ancillary works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 19 Aug 2021
- Residential units
- 2
- Floor area
- 173 m²
Timeline
Application received
25 Jun 2021
Decision due
19 Aug 2021
Decision: conditional
17 Aug 2021
Grant issued
21 Sept 2021
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
a new dwelling house, site entrance, connections to existing town services and all associated site works
a hobby shed, two garden sheds, a timber open-sized gazebo and a polytunnel in the rear garden area
erection of a 24 metre high telecommunications monopole with antennas, dishes and associated equipment attached, and with equipment cabinets at ground level all enclosed by security fencing
the construction of a new two storey dwelling house, a wastewater treatment system, a new vehicular entrance and gate and all ancillary site works (Outline Planning Reference Number 21/1776). Planning Permission is also sought for the construction of a domestic garage
the demolition of the existing rear extension and attached shed structures, the construction of a new extension to the existing dwelling, the construction of a new detached garage, the installation of a wastewater treatment system, a new vehicle entrance, and all associated site works
A) Construction of a single storey 2No. classroom ASD unit, Mainstream classroom and SET room extension to the rear of the existing school and erect signage, B) Extend existing staff carpark, C) Relocate existing basketball court, extend existing play area together with new sensory garden, D) Relocate existing gas tank, E) proposed new plant, F) Demolishing and removing existing prefab, together with connections to all existing services along with all associated site works.