Ballyhahill, Co. Limerick
Proposed development
Construction of Phase 1 of a housing development consisting of 10no. semi-detached dwelling houses, 2no. detached dwelling houses, new entrance, roads and services layout, connection to the public sewer together with all associated site works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- Not available
- Residential units
- 12
- Floor area
- 1420.8000000000002 m²
Timeline
Application received
28 May 2020
Council asked for further information
14 Jul 2020
Decision due
Not available
Site location with nearby applications
Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
a new calf shed, manure pit, effluent tank, demolition of existing calf shed and replacement with extension to existing cubicle shed and extension to existing silage pit, new underground slatted slurry tanks, new soiled water tank, relocation of existing meal bin and removal of second existing meal bin, roof over area of existing collecting yard, concrete yards and ancillary works
the change from a window to a door and the installation of an external stairs at the rear of the first-floor apartment (Apartment no. 2)
change of use from vacant public house to residential to provide 2 no. apartments and a semi detached dwelling, alterations to the front elevation of the building to remove the existing shopfront and window and install 2 new external doors and a window, the installation of a roof light, a new pedestrian gate to the side of the building and all associated site works. Full Planning permission is also being applied for the subdivision of the site to provide Site A - semi detached dwelling and Site B - 2 no. apartment units. Retention permission is being sought for an existing extension to the rear of the building
partial demolition of existing dwelling house and construct of extension and alterations to form new dwelling house, with all associated site works and existing connection to all public utility services
(a) the partial demolition of existing dwelling house, (b) the construction of extension and alterations to form new dwelling house, with all associated site works and existing connection to all public utility services
change of use from Montessori School to dwelling house, new vehicular entrance, revision to site boundary and all ancillary site works