1987Grantedpermission

Ballygoughlin, Glin, Co. Limerick.

Not open for objections: The council has already decided this application.

Proposed development

Changes to previously approved permission ref. 17/729 comprising; (a) relocation and complete redesign of the proposed dwelling (a detached part two storey, part single storey house), (b) relocation and redesign of the proposed detached domestic garage, (c) revisions to the driveway layout and (d) all ancillary site works

Applicant
Not published
Authority
Limerick City and County Council
Decision due
31 Mar 2019
Residential units
1
Floor area
239.8 m²
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    4 Feb 2019

  2. Decision due

    31 Mar 2019

  3. Decision: conditional

    21 Mar 2019

  4. Grant issued

    24 Apr 2019

Loading map…

Site location with nearby applications

Can't object to this one

The council has already decided this application.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

2660943Awaiting decision

a renewable energy development as defined by The European Union (Planning and Development) (Renewable Energy) Regulations 2025. The Proposed Development, subject of this application, will consist of: The development and operation of a solar photovoltaic (PV) farm with a total area of 245.33 ha, 70.01 ha of which lies within Co. Limerick. The application seeks a 10-year permission with an operational lifetime of 40 years and comprises the following – i. Construction and operation of up to 219,706.1sqm of solar PV arrays on ground-mounted metal frames, with a maximum overall height of up to 2.79 metres. ii. Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor / transformer skid units. iii. Up to 8 no. electrical inverter / transformer skid units. iv. Construction and operational access to the site by 3 no. site entrances using existing field access points. v. 2 no. temporary construction compounds and ancillary facilities for the duration of the construction phase of the project. vi. Customer substation compound consisting of a single storey substation customer building with welfare facilities (217 sqm), all associated electrical plant and apparatus, underground cabling, lighting columns, parking, storage, fencing, wastewater holding tank and rainwater harvesting tank. vii. 33kV collector cable network, joint bays and associated works. viii. Internal access tracks, site landscaping and drainage works, security fencing, CCTV and all associated ancillary site development works. ix. The decommissioning and reinstatement of the solar farm at the end of its operational life. The elements of the Proposed Project located in Co. Limerick, as described above in i – ix, are the subject of this planning application. The remaining elements, including the construction of up to 541,306.68 sqm of solar PV arrays on ground-mounted metal frames, with a maximum overall height of up to 2.79 metres, internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor / transformer skid units, up to 19 no. electrical / inverter transformer skid units, construction and operational access to the site by 6 no. site entrances, using 4 no. existing field access points and 2 no. new access points, 3 no. temporary construction compounds and ancillary facilities for the duration of the construction phase of the project, 33kV collector cable network, joint ba

Ballygoghlan, Glin, Co. Limerick Limerick City and County Council Received 14 Aug 2026
17729Granted

a storey and half dwelling, wastewater treatment unit and polishing filter, and to construct a well and to demolish rear extension of existing dwelling, and for change of use of existing dwelling to domestic garage and all ancillary site works

Ballygoghlan, Glin Co Limerick Limerick City and County Council Received 31 Jul 2017