Islandduane, Mungret, Co. Limerick.
Proposed development
A ten year permission to develop a solar farm. The proposed solar farm will comprise the construction and operation of solar PV arrays mounted on metal frames on a 12.1 hectare site, inclusive of a single electrical control building, onsite substation, up to 2 no. inverter units, up to 2 no. temporary construction areas with ancillary facilities, boundary fencing with CCTV units, use of existing access, an access track and all ancillary works (inclusive of gross floor space of proposed works up to 100.4 sqm). The planning application is accompanied by an Environmental Report and stage 1 screening for appropriate assessment
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 30 Aug 2018
Timeline
Application received
8 Mar 2018
Council asked for further information
1 May 2018
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
3 Aug 2018
Decision due
30 Aug 2018
Decision: conditional
30 Aug 2018
Grant issued
3 Oct 2018
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the demolition of an existing store attached to the dwelling house, an adjoining wall and two existing outbuildings the construction of a storey-and-a-half extension to the existing dwelling house, with an attached carport, privacy wall and garage connection to the existing septic tank and installation of a new upgraded percolation area and all ancillary site works
the construction of a dwelling house, detached domestic garage, front boundary entrance walls with the installation of a mechanical aeration unit and polishing filter system with all associated site works
the decommissioning of an existing septic tank system and the construction of a replacement wastewater treatment system and all ancillary site works
the decommissioning of existing septic tank and soakpit, installation of packaged waste water treatment system and eco-flo filter
a mobile home
construction of (a) single storey front side extension, (b) two storey rear extension and (c) new front entrance porch. In addition extensive external/internal modifications to existing house and all associated site works