Clonshire Beg, Adare, Co Limerick
Proposed development
The construction of a new dwelling house, site entrance, waste water treatment system, percolation area and all associated site works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 11 Sept 2017
- Residential units
- 1
- Floor area
- 260 m²
Timeline
Application received
9 Jun 2017
Council asked for further information
1 Aug 2017
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
15 Aug 2017
Decision due
11 Sept 2017
Decision: conditional
8 Sept 2017
Appeal decided: refused (91.249284)
13 Mar 2018
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the relocation and construction of an all-weather equestrian riding arena measuring approximately 85m x 50m, including arena drainage and riding-surface build-up; a hardstanding area for loading and unloading; internal access roads; surface-water drainage infrastructure, including filter drains and soakpit arrangements; associated fencing, landscaping and boundary treatments; and all ancillary site development works
the construction of a dwelling, site entrance, install on-site effluent treatment system and all associated site development works
an uncovered all weather horse exercise/jumping arena, associated fencing and associated works
the development that will consist of: The demolition of 2 agricultural outbuildings, the demolition of the rear return and front annex of the existing cottage, the renovation of the existing cottage, the construction of a single storey and two storey extension, the construction of a garage, wastewater treatment system, site entrance and all ancillary site works above and below ground
the construction of a single storey extension to the rear of the existing dwelling house, front and side elevational changes, an amended entrance and all ancillary site works
construction of house, effluent disposal system, entrance and associated site works