Ellaha and Ballinknockane, Co. Limerick.
Proposed development
A ten year permission for the complete development of a Solar PV Energy development with a total site area of 61.29 hectares, to include one Transmission System Operator (TSO) electrical substation with associated switchgear, TSO compound and control building, one customer substation with transformer, communications pole, compound and control building, electrical transformer and inverter station modules, Solar PV panels ground mounted on support structures, access roads and internal access tracks, spare parts storage containers, fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, a temporary site compound area, additional landscaping and habitat enhancement as required and associated site development works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 23 Aug 2018
Timeline
Application received
21 Dec 2017
Decision due
23 Aug 2018
Decision: conditional
23 Aug 2018
Grant issued
26 Sept 2018
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the construction of a 44.7m underground medium voltage(38kV) grid connection cable from the consented Ballinknockane and Ellaha Solar Farm(PA Ref:17/1220) to the section of Solar Farm currently in planning(PA Ref:22/1258) comprising the laying of underground cables and associated infrastructure
a new 110kV substation to feed into the existing Aughinish - Kilpaddoge 110kV overhead line
to amend condition 6 of planning permission ref 20/688. The amendment will allow for an increase in the maximum tonnage of waste allowed per calendar year from 15,000 to 24,000. On completion of the importation of waste, the site(including the areas previously filled under permissions 06/233, 11/7059, 12/164, 17/250 & 20/688) is to be covered with topsoil throughout and seeded with grass seed. Thes works are to take place at my landfill site and will require a waste permit
the completion of the existing landfill and storage of timber overground (previous planning ref:s 06/233, 11/7059, 12/164& 17/250. The permission requires a waste licence
the complete development of a Solar PV Energy development with a total site area of 65.76 hectares, to include two electrical substation buildings and associated compound, electrical transformer and inverter station modules, one customer substation with one communications pole attached, storage modules, Solar PV panels ground mounted on support structures, access roads and internal access tracks, spare parts storage container, fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, a temporary site compound area, additional landscaping and habitat enhancement as required and associated site development works