Timahoe West, Coill Dubh, Naas
Proposed development
Will consist of constructing 4 no. dormer bungalows,4 no. detached garages, new individual effluent treatment system to each dwelling, 2 no. dual recessed vehicular entrances, widening of existing access roadway with new footpath along site boundary and all associated ancillary site-works
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- 11 Jun 2023
- Residential units
- 4
- Floor area
- 742.1999999999999 m²
Timeline
Application received
17 Apr 2023
Decision due
11 Jun 2023
Decision: refused
7 Jun 2023
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
construction of a one and half storey type dwelling, detached domestic garage, proprietary effluent treatment system, shared recessed vehicular entrance, and all associated ancillary site works.
for construction of a new 4 Bedroom dormer dwelling, Detached Garage, Effluent waste treatment system, proposed new entrance and all associated site development works
for a one and half storey type dwelling, detached domestic garage, proprietary effluent treatment system, shared recessed vehicular entrance, and all associated ancillary site works. Revised by Significant Further Information which consists of revised locations for proposed one and a half storey type dwelling, detached domestic garage, and propriety effluent treatment system, on the subject site
for 2 no. storage sheds for domestic use. Shed no.1 for Turf fuel storage and Shed no.2 for storage of garden equipment
to construct Bungalow, Domestic Garage, Oakstown Wastewater treatment system and percolation area and all associated works and services
for a 10-year permission, for the construction and operation of a renewable energy development within a site boundary of c. 114 ha. The proposed development will consist of a development area of circa 71.7 ha including solar on fixed on ground mounted frames with a maximum height of 3 metres, 1 No. battery storage compound, 1 No. customer switchgear container, 1 No. 110kv grid connected single storey substation, 1 No. single storey customer substation and all associated electrical plant, inverter units, electrical transformers, battery units, cooling equipment, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, upgrading of existing access road and new internal access roads and all associated ancillary activities. The proposed development will have a 35-year operational life from the date of commissioning. Revised by significant further information which consists of Provision of quantum of energy export (of up to 80MW) in the proposed development and storage capacity of proposed battery compound (of up to 80MWh). Clarification of energy export (of up to 15MW, no battery storage) of adjacent permitted development 15/1172 (extension of duration under 20/1052); Submission of details of adjacent permitted development 15/1172 (extension of duration under 20/1052); Provision of details of minor works to site entrance, construction traffic warning signage to public roadway, at proposed site entrance and also within internal haul routes; Clarification of extent of private roadway (haul roads) within the site; Provision of a fire risk assessment of hazards for on or near the solar array and battery storage compound; Provision of programme/schedule of works for proposed development and adjacent permitted development 15/1172 (extension of duration under 20/1052; Provision of amended Archaeological Impact Assessment. Provision of draft Construction Traffic Management Plan; Provision of Independent Road Safety Audit Stage 1/2; Provision of amended preliminary Construction and Environment Management Plan; Provision of Preliminary Public Liaison Engagement Plan