Rahilla Glebe, Dunmurry West and, Guidenstown South
Proposed development
Is sought for a period of 10 years with an operational period of up to 30 years for a ground mounted solar photovoltaic (PV) farm on a site area of 49.74 hectares within the site of the Dunmurry Springs Golf Club. The proposed development consists of solar photovoltaic panels covering an area of up to 92,024 m² on ground mounted steel frames; 1 no. 38 kV on-site substation/control room and palisade fencing; up to 10 no. inverter/transformer container units; underground cabling and ducts; boundary security fence; use of existing entrance to public road at Dunmurry Springs Golf Club; new and upgraded internal access tracks; upgrade of an existing maintenance access onto the public road; construction of a maintenance shed; CCTV cameras; 1 no. temporary site compound; landscaping and all ancillary site services and works within the townlands of
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- 6 Jan 2021
Timeline
Application received
3 Nov 2020
Decision due
6 Jan 2021
Decision: refused
4 Jan 2021
Appeal decided: conditional (309319-21)
22 Oct 2021
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for to change external facades to block and render finish and all associated site works
for alterations to the works granted under planning reference 05/22 which include: (1) Alterations to the existing dwelling including adjustment of the roof pitch and an attic conversion of 139sqm, a 19sqm single storey side extension (sunroom) and minor alterations to all elevations. (2) Relocation of existing stable block/barn and minor alterations to the plans and elevations. (3) Construction of a single storey outhouse to the rear of the dwelling. (4) And all associated site works
1. Alterations to the existing dwelling including adjustment of the roof pitch and an attic conversion of 139m2, a 19m2 single storey extension (sun-room) and minor alterations to all elevations. 2. Relocation of existing stable block / barn and minor alterations to the plans and elevations. 3. Repositioning of septic tank and percolation area. 4. And all associated site works.
The development consist / consists of a ground mounted solar photovoltaic (PV) farm within a site area of 26 hectares consisting of solar photovoltaic panels covering an area of up to 185,000m2 on ground mounted steel frames, 1 no; on-site substation / control room and palisade fencing, up to 5 no. inverter / transformer stations, underground cables and ducts, boundary security fence, use of existing entrance to public road at Dunmurray Springs Golf Club, upgrade to parts of existing track from the public road to the proposed solar farm, new and upgraded internal tracks, CCTV cameras, two temporary site compounds and all associated site services and works located within townlands. Permission is sought for 10 years.
the construction of 2 No. 2 bedroom holiday apartments in the first floor attic space of the existing golf clubhouse, associated alterations to existing clubhouse elevations, foul water to existing on site effluent treatment system and percolation area, 3 No. car parking spaces and all associated site works
the construction of 2 no. 2 bedroom holiday apartments in the first floor attic space of the existing golf clubhouse, associated alterations to existing clubhouse elevations, foul water to existing on site effluent treatment system and percolation area, 3 no. car parking spaces and all associated site works