Carrick Lodge, Maddenstown North, The Curragh
Proposed development
RETENTION: as constructed the dwelling known as Carrick Lodge, previously granted permission under file ref: 98/1794, at Maddenstown North, The Curragh, County Kildare, including retention of entrance gate, alterations to site boundaries, effluent treatment system as constructed and all associated site works, on behalf of the executors of the will of P.J. Burke, namely: Martyn Burke, Jonathan Burke, and Eileen Birkinshaw
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- 24 Jan 2020
Timeline
Application received
12 Aug 2019
Council asked for further information
3 Oct 2019
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
19 Dec 2019
Decision due
24 Jan 2020
Decision: conditional
21 Jan 2020
Grant issued
26 Feb 2020
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for single storey porch with a floor area of 8.59 sq. m. to the front elevation of our house, together with all associated site works
(a) Extension to original house as constructed relative to Planning Permission Ref: 77534 and (b) outbuildings (2 sheds) as constructed
Development at the existing equine bloodstock facility comprising the demolition of existing farm buildings (765 sq.m) and; provision of an equine farm isolation unit comprised of (i) a stable building (294sq.m) consisting of 8 no. isolation stables with feedstore, staff room and treatment room. The building includes roof lights on the roof slope; (ii) new entrance gates and piers at existing farmyard entrance and new tree lined access road to the isolation yard, with a side road off it to a residential dwelling (currently under refurbishment) on adjacent lands; (iv) a new hay barn/machinery store (104 sq.m), slurry pit (124 sq.m) and a horse loading ramp located north of the proposed isolation unit (v) The development will also include provision of effluent treatment system, landscaping boundary treatments and all associated site development works necessary to facilitate the development
as constructed the dwelling known as Pjanjo, including the existing entrance gate, alterations to site boundary, retention of effluent treatment system as constructed, all previously granted permission under file ref: 98/1600, and all associated site works, on behalf of the executors of the will of P.J. Burke, namely: Martyn Burke, Jonathan Burke, and Eileen Birkinshaw
The general refurbishment works to the existing bungalow including – Removal of existing, flat roof extension to south-eastern side gable (22sq.m); Provision of a new dormer with windows to the rear roof providing additional habitable floor area of 14 sq. M within the roof; Provision of a rendered external insulation system to all external walls; Removal of existing chimneys to main roof; Provision of 2 no. x French door openings to the existing south western side gable elevation and re-positioning of existing car entrance gateway, general landscaping and all site development works necessary to facilitate the development. Revised by significant further information consisting of; a new wastewater treatment system (Solido Smart 8PE) to the north of the existing building
development at the existing equine bloodstock facility comprising: (i) Demolition of existing single storey, 3 bedroom stud farm accommodation unit (153sqm); (ii) Construction of a replacement single storey, 3 bedroom staff accommodation unit (182sqm); (iii) Construction of a new single storey farm security hut/building (42sqm); and, (iv) Modifications to existing main entrance to provide new entrance gates with stone walls and piers with 2 No. new pedestrian access gates; (v) The development will also include staff and visitor car parking, upgrade to part of existing internal access road with pedestrian footpaths and security gates, decommissioning of existing septic tank and provision of new wastewater treatment system, landscaping, boundary treatments and all associated site development works necessary to facilitate the development