Gurteen, Johnstown Bridge, Enfield
Proposed development
(a) Removal of existing single storey garage to the rear of existing dwelling; (b) Decommissioning and removal of existing septic tank and percolation area; (c) The installation of a new wastewater treatment unit and percolation area; (d) The construction of new single storey extensions to the side and rear of the existing dwelling house with rooflight over carer's quarters; (e) Alterations to the fenestration and finishes of the existing dwelling house; (f) A new porch and bay window to the front; (g) Construction of gable ends to the existing hip roof, and (h) All associated site works
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- 4 Sept 2019
Timeline
Application received
24 May 2019
Council asked for further information
8 Jul 2019
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
8 Aug 2019
Decision due
4 Sept 2019
Decision: conditional
3 Sept 2019
Grant issued
8 Oct 2019
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (new house) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
a single-storey dwelling, detached domestic garage, new site entrance, connection to all public services along with all associated site works and services
the construction of a single storey extension to the rear of the existing dwelling, to provide a new kitchen/living/dining accommodation, utility room, bedroom and study, together with internal alterations, the installation of a new on-site wastewater treatment system with soil polishing filter, and all associated site development works
the construction of a single-storey extension to the rear of the existing dwelling, to provide kitchen/living/dining accommodation, utility room, bedroom and study, together with internal alterations, the upgrade and/or installation of an on-site wastewater treatment system and associated percolation area, and all associated site development works
for the construction of a new Wellness Facility to include: 2 No. sauna units, 1 No. Jacuzzi, 2 No. hot tubs, Reception building with changing facilities and toilets, 2 No. padel courts, Bicycle parking, Car parking including 2 No. EV charging spaces, Rainwater harvesting system, connection to existing hotel watermains, foul sewer and surface water facilities on site, new site boundary treatment and all associated site works. Revised by Significant further Information which consists of: Permission for the construction of a new Wellness Facility comprising 2 no. sauna units, 1 no. jacuzzi, 2 no. hot tubs, reception building with changing facilities and toilets, 2 no. padel courts, bicycle parking, car parking including 2 no. EV charging spaces, rainwater harvesting system, connection to existing hotel watermains, foul sewer and surface water facilities, new site boundary treatment and all associated site works
(A) the erection of a two-storey apartment building consisting of 4no. 1-bedroom apartments, 2no. 2-bedroom apartments and 2no. 3-bedroom apartments. (B) New access roadway and footpath from Dunfierth Park with car parking, cycle parking, bin storage area and associated landscaping. (C) Connection to existing main foul sewer, connection to existing public watermain and all associated ancillary site development and surface water drainage works
For 10 no dwelling consisting of A) eight number three bedroom semi-detached dwellings, B) one number three bedroom detached dwelling, C) on e number four bedroom detached dwelling with domestic garage, D) site infrastructure works including access road with associated footpaths, storm water collection drains and onsite attenuation and soakway areas foul sewer connection to existing public main and watermain infrastructure, E) New site entrance along with all associated site development, landscaping, boundary treatments and facilitating works.