Allenwood Enterprise Park, Allenwood Middle, Naas
Proposed development
(a) A single use industrial unit for the storage and distribution of vehicle tyres; (b) Connection to existing foul and surface mains network; (c) Access entrance from existing enterprise park infrastructure; (d) Provide staff parking and vehicle drop off/collection points; and (e) All associated site works
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- Not available
Timeline
Application received
11 Apr 2019
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (industrial or warehouse building) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
for the construction of an industrial type building for the secure storage of prefabricated modular building components and all associated site works at the existing storage facility granted permission under file ref number 21/1544
for a single storey rear extension to existing Childcare Centre comprising of 2 no. classrooms, staff room, plant room & ancillary accommodation, associated alterations to all elevations, foul water to existing treatment system, surface water to soakaways and all associated site works
the construction of a rear extension to existing detached industrial building and all associated site works. Permission for THR decommissioning of existing connection to existing communal septic tank and provision of a new secondary effluent treatment system to replace existing connection to communal septic tank
for the construction of a rear extension to existing detached industrial building and all associated site works. Permission for thr decommissioning of existing connection to existing communal septic tank and provision of a new secondary effluent treatment system to replace existing connection to communal septic tank
a private on-site package wastewater treatment system on the Allenwood Community Development Association CLG (ACDAL) site. The work includes the construction of a new wastewater treatment plant with primary and secondary treatment discharging to wetland ponds for tertiary treatment with passive discharge of the treated effluent through peat to ground. A new below ground foul pipe network and pumping station are also included.
for the construction of a detached single storey domestic garage and all associate site works