MTU North Campus, Dromtacker, Tralee
Proposed development
REDSIII for a c.125 kWp renewable energy solar PV installation consisting of up to c.575m2 (213No.) Roof Mounted solar panels and all associated works
- Applicant
- Not published
- Authority
- Kerry County Council
- Decision due
- 26 Apr 2026
Timeline
Application received
19 Jan 2026
Decision due
26 Apr 2026
Decision: conditional
24 Apr 2026
Grant issued
28 May 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
previously permitted under Planning Ref. 26/60694, for the revisions to the external elevations and façade treatments of the approved two-storey building, modifications to the internal layout at ground floor and first floor levels, minor modifications to the layout of the approved mechanical room, together with all associated ancillary site works necessary to facilitate the proposed amendments
We Astellas Ireland Co., Ltd., intend to apply for permission for development at Kerry Technology Park, Dromthacker townland and Knockawaddra West townland, Tralee, Co. Kerry. The development will consist of: Construction of an extension to the existing Astellas Production Building to support works associated with permitted development under planning number 23/60295, comprising a single level building extension with a gross floor area of 99.2 square meters and maximum height of 7.14 meters above established ground level and an adjustment to the existing production building rooftop at the east elevation to provide for air conditioning and process ducts and vents. The development will include an associated underground ethanol storage tank and sump; an IBC (Intermediate Bulk Container) area; ancillary underground piping; a re-alignment of the internal roads and footpaths; and associated ground works.
Permission for the construction of a single-storey recycling management building together with all associated site development works including site drainage, adjustments to site levels and adjustments to the approved landscape plan
Retention permission to retain the following: (a) conversion of the garage to living accommodation, (b) sunroom to the rear of the dwelling house
The construction of a two-storey building comprising of a fallow area on ground floor for future staff welfare facilities and staff canteen and kitchen at first floor level within the existing site campus, ancillary outbuildings, adjustments to positioning and layout of the approved car park to facilitate the proposed building, with no change in total number of permitted spaces, external ground mounted plant and equipment, new signage on the southern elevation together with all associated site development works including realignment of the approved site drainage, adjustments to site levels and adjustments to the approved landscape plan.
Permission for a new single-storey dwelling house with attic accommodation and associated site works and services including new site entrance