Ballydwyer East, Ballymacelligott, Co. Kerry
Proposed development
Retention permission to retain the wastewater treatment unit as installed and to retain the site entrance all associated site works all at Ballydwyer East, Ballymacelligott, Co. Kerry
- Applicant
- Not published
- Authority
- Kerry County Council
- Decision due
- 18 Jun 2024
- Residential units
- 1
- Floor area
- 1 m²
Timeline
Application received
24 Apr 2024
Decision due
18 Jun 2024
Decision: conditional
18 Jun 2024
Grant issued
22 Jul 2024
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Permission to (a) to disconnect from existing wastewater treatment system and install a new mechanical treatment unit and polishing filter to serve existing dwelling, (b) close existing site entrance and construct new site entrance and (c) Retention Permission to retain the existing dwelling house and sheds within revised site boundaries and all associated works
Planning Permission to (A) disconnect from existing waste water treatment system and install a new mechanical treatment unit and polishing filter to serve existing dwelling and (B) Close existing site entrance and construct new site entrance Now Amended to: Planning Permission to (A) disconnect from existing waste water treatment system and install a new mechanical treatment unit and polishing filter to serve existing dwelling and (B) Close existing site entrance and construct new site entrance and Retention Permission to retain house and shed within revised site boundaries
(a) retain the existing shed (b) retain existing dwelling house and sheds within revised site boundaries and Planning Permission to construct new site entrance and access road and all associated site works
permission to construct (A) a new dwelling house served by a secondary treatment system followed by soil polishing filter, (B) upgrade the existing entrance and (C) construct a new domestic garage together with all associated site works and services
RETAIN THE EXISTING GARAGE/SHED TO THE FRONT OF THE DWELLING AND PERMISSION FOR THE ALTERATIONS TO EXISTING FIRST FLOOR ELEVATIONS INCLUDING NEW PORTAL WINDOW TO FRONT GABLE WALL, INCREASED WIDTH OF SIDE GABLE BEDROOM WINDOW, 2 REAR VELUX WINDOWS AND NEW REAR DORMER ROOF TO AN EXISTING DWELLING ALONG WITH RETENTION PERMISSION TO RETAIN EXISTING GARAGE/SHED TO THE FRONT OF THE DWELLING AND RETENTION PERMISSION TO REATIN LEAN-TO WOOD STORE, BARNA TIMBER SHED, CHILDREN'S GARDEN ROOM/WENDY HOUSE AND CHICKEN COOP
INVALID