CLIDDAUN AND BURNHAM WEST, DINGLE, CO KERRY
Proposed development
RETAIN (A) THE CONTINUING HISTORICAL USE OF AN EXISTING DWELLING HOUSE AS A SHORT TERM RENTAL ACCOMMODATION; AND (B) ELEVATIONAL REVISIONS TO THE AFOREMENTIONED DWELLING HOUSE, NAMELY WINDOWS AND A FRONT PORCH/BALCONY STRUCTURE
- Applicant
- Not published
- Authority
- Kerry County Council
- Decision due
- 22 Jun 2023
Timeline
Application received
28 Apr 2023
Decision due
22 Jun 2023
Decision: refused
21 Jun 2023
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
RETENTION PERMISSION TO REATIN AN EXISTING DWELLING HOUSE AS CONSTRUCTED WITHIN REVISED SITE BOUNDARIES AND PLANNING PERMISSION TO CONSTRUCT 2 NUMBER EXTENSIONS, ONE TO THE SIDE AND ONE TO THE FRONT AND ALSO MAKE ELEVATIONAL CHANGES TO AN EXISTING DWELLING HOUSE, ELEVATIONAL CHANGES TO INCLUDE, BLOCK UP EXISTING AND REDESIGN SOME WINDOW OPENINGS, ADD ROOF LIGHTS TO SERVE THE GROUND FLOOR AREA, ALSO TO ALLOW FOR MINOR INTERNAL LAYOUT ALTERATIONS AND PLANNING PERMISSION TO DECOMMISSION AND REMOVE AN EXISTING SEPTIC TANK AND SOAK PIT ON SITE AND IN ITS PLACE INSTALL A NEW WASTEWATER TREATMENT UNIT DISCHARGING TO A SOIL POLISHING FILTER AND ALSO TO INCLUDE ALL ASSOCIATED SITE WORKS
(A) The construction of a slatted shed consisting of holding pens, feeding passages, underground slurry storage tanks; and (B) all associated site works
CONSTRUCT A STOREY AND A HALF EXTENSION INCLUDING CARRYING OUT ALTERATIONS TO THE ELEVATIONS OF THE EXISTING HOUSE, DECOMMISSION EXISTING SEPTIC TANK AND CONSTRUCT A TRI-CEL WASTE WATER TREATMENT UNIT WITH A SANDCEL 900 ON A PEA GRAVEL BASE
(A)PERMISSION TO DEMOLISH FRONT PORCH & CONSTRUCT NEW FRONT PORCH,ALTERATIONS TO EXISTING TWO STOREY HOUSE TO INCLUDE ALTERATIONS TO ROOFS & EXTERIOR OF SIDE EXTENSION& EXTENSIONTO REAR RETURN STRUCTURE & 2 VELUX WINDOWS TO FRONT ELEVATION,TOGETHER WITH TWO NEWWINDOWS TO EXISTING DWELLING ON THE EAST FACING ELEVATION AT GROUND FLOOR LEVEL (B) CHANGE OF USE OF EXISTING SHED STRUCTURE TO NEW CORRIDOR WITH LINK TO THE NEW REAR EXTENSION CONSISTING OF FAMILY ROOM, UNDER STAIRS WC/SHOWER ROOM, AND GROUND FLOOR LEVEL BEDROOM, AND FIRST FLOOR LEVEL DORMER BEDROOM TO MATCH ROOF LEVEL OF EXISTING DWELLING (C) DEMOLITION OF EXISTING LEAN TO SHEDS TO THE FORGE BUILDING AND TO PROVIDE CAR PARKING IN PLACE OF SAME (D) PROVIDE A NEW WINDOW TO THE FRONT SIDE (WEST FACING) AND REAR ELEVATION OF THE FORGE ANNEXE ROOM AND (E) DECOMMISSION EXISTING SEPTIC TANK AND INSTALL A NEW PROPRIETARY WASTE WATER TREATMENT UNIT AND POLISHING FILTER ALL WITH ASSOCIATED ANCILLARY SERVICES/ SITE WORKS