CLADDANURE EAST, KENMARE, CO KERRY
Proposed development
CONSTRUCT A TWO STOREY TYPE DWELLING HOUSE, INSTALL A SEPTIC TANK AND PERCOLATION AREA TO SERVE THE DWELLING, CONNECT TO PUBLIC WATER SUPPLY AND CONSTRUCT A NEW SITE ENTRANCE TO FACILITATE THE DEVELOPMENT AND ALL OTHER SITE WORKS
- Applicant
- Not published
- Authority
- Kerry County Council
- Decision due
- 15 Nov 2022
- Residential units
- 1
- Floor area
- 1 m²
Timeline
Application received
21 Sept 2022
Decision due
15 Nov 2022
Decision: refused
15 Nov 2022
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Permission to construct a 2 storey extension to my 2 storey dwelling house including all necessary modifications to the existing dwelling to facilitate both the construction of the extension and internal remodelling.
The development consists of (a) permission to construct a two-storey dwelling house, (b) permission for the installation of a wastewater treatment tank and polishing filter to serve the proposed dwelling house, and (c) permission to construct a new site entrance off the private roadway to facilitate the development and all other associated site works.
John Michael and Olive O’ Sullivan for Full Planning Permission to construct a new dwelling house with connection to wastewater treatment system and all associated site services
The demolition of 3 no. agricultural shed structures and the construction of 64 no. dwellings, car parking, landscaping and all ancillary site development works. The proposed development will consist of: 8 no. 4-bedroom detached dwellings, 46 no. 3-bed semi-detached dwellings and 10 no. 2-bed semi-detached dwellings. Vehicular and pedestrian access will be provided via a new entrance located off the Sneem Road (N70).
The development consists of (a) permission to demolish an existing dwelling house and to decommission the existing wastewater treatment system, (b) permission to construct a replacement dwelling house, (c) permission for the installation of a wastewater treatment tank and polishing filter to serve the proposed dwelling house, and (d) permission for all associated site works
The development consists of (a) retention planning permission to retain an extension on the western side of the building, a larger covered area in the enclosed yard on the eastern side of the building and a canopy at the front of the building, (b) retention planning permission to retain elevational changes made to the building, (c) permission to construct an extension on the eastern side of the building, (d) permission to construct an extension and a canopy over the existing roller door on the western side of the building and (e) permission for all elevational changes to the existing building to facilitate the development and all associated site works.