GARFINNY, DINGLE, CO KERRY
Proposed development
CONSTRUCT A STOREY AND A HALF DWELLING HOUSE SERVED BY A WASTEWATER TREATMENT UNIT DISCHARGING INTO A SAND POLISHING FILTER, ALSO TO INCLUDE ALL ASSOCIATED SITE WORKS
- Applicant
- Not published
- Authority
- Kerry County Council
- Decision due
- 30 Oct 2022
- Residential units
- 1
- Floor area
- 1 m²
Timeline
Application received
5 Sept 2022
Decision due
30 Oct 2022
Decision: refused
28 Oct 2022
Appeal decided: refused (315113-22)
22 Feb 2024
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
to retain an existing dwelling house with attic storage accommodation all as constructed and Planning Permission to decommission existing septic tank system and install a new wastewater treatment system and associated site works
CONSTRUCT A BUILDING CONTAINING 2 STABLES AND TACK ROOM WITH AN ATTIC HAY STORGE AREA, AND ALSO TO INCLUDE ASSOCIATED SITE WORKS
(A) RETAIN PARTIAL DEMOLITION AND REBUILD OF A HOUSE, CONSTRUCTION OF A PORCH, CONSTRUCTION OF AN EXTENSION, PAINTING OF A MURAL, (B) INSTALLATION OF A WASTEWATER TREATMENT SYSTEM AND (C)CHANGE OF USE FROM AN AGRICULTURAL SHED TO ART STUDIO FOR APPLICANT/DOMESTIC STORAGE BUILDING
RETAIN (A) SINGLE STOREY EXTENSION CONSTRUCTED TO THE REAR OF THE EXSISTING DWELLING WHICH INCLUDES PARTLY-CONSTRUCTED SITE DEVELOPMENT WORKS (B) RETAIN THE RENOVATION AND RESTORATION WORKS CARRIED OUT TO THE EXISTING DWELLING (C) RETAIN THE UPGRADING OF THE EXISTING WASTEWATER TREATMENT SYSTEM WHERE THE EXISTING SEPTIC TANK WAS REPLACED WITH A NEW SEPTIC TANK AND A PARTLY CONSTRUCTED NEW PERCOLATION AREA (D) PERMISSION TO COMPLETE THE SITE DEVELOPMENT WORKS AND THE PARTLY CONSTRUCTED NEW PERCOLATION AREA
(A) DEMOLISH EXISTING SINGLE STOREY EXTENSION TO THE REAR OF DWELLING HOUSE (B) CONSTRUCT AN EXTENSION TO REAR, SIDE AND PORCH TO THE FRONT OF EXISTING DWELLING HOUSE (C) ALTER EXISTING SITE ENTRANCE (D) DECOMMISSION EXISTING SEPTIC TANK SYSTEM WITH ALL ASSOCIATED ANCILLARY WORKS
(A) RETAIN AS CONSTRUCTED DWELLING HOUSE WITH SEPTIC TANK AND PERCOLATION AREA (B) EXISTING SITE ENTRANCE AND FRONTSIDE BOUNDARY AND (C) ALL WITHIN REVISED SITE BOUNDARIES