DROM WEST, GLENBEIGH, CO KERRY
Proposed development
CONSTRUCT A SINGLE STOREY TYPE DWELLING HOUSE C/W SECONDARY TREATMENT UNIT AND SOIL POLISHING FILTER AND ALL ASSOCIATED SITE WORKS IN ACCORDANCE WITH PLANS AND PARTICULARS SUBMITTED
- Applicant
- Not published
- Authority
- Kerry County Council
- Decision due
- 6 Dec 2018
- Residential units
- 1
- Floor area
- 1 m²
Timeline
Application received
31 Aug 2018
Council asked for further information
24 Oct 2018
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
9 Nov 2018
Decision due
6 Dec 2018
Decision: conditional
6 Dec 2018
Grant issued
17 Jan 2019
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
(1) TO RENOVATE EXISTING SINGLE STOREY DWELLING, (2) CONSTRUCT SINGLE STOREY EXTENSIONS TO THE SOUTH (SIDE) AND WEST (REAR) OF THE DWELLING, (3) REMOVE EXISTING STEELTECH SHED AND REPLACE WITH A MASONRY BUILT SHED, (4) ALTER EXISTING SITE ACCESS, (5) DECOMMISSION EXISTING FOUL TREATMENT SYSTEM AND INSTALL A NEW PROPRIETARY WASTEWATER TREATMENT SYSTEM, (6) ALL ANCILLARY SITE WORK
DEMOLISH EXISTING HOUSE, CONSTRUCT A NEW HOUSE AND TO REPLACE EXISTING SEPTIC TANK WITH AN EFFLUENT TREATMENT TANK AND POLISHING FILTER
(1) DEMOLISH SINGLE STOREY SPLIT LEVEL DETACHED DORMER BUNGALOW AND SINGLE STOREY SHED TO REAR AND SIDE ON WEST BOUNDARY (2) CONSTRUCTION OF A REPLACEMENT HOUSE,SINGLE STOREY TO THE FRONT (SOUTH) AND SIDE (WEST) ELEVATION AND TWO STOREY TO THE SIDE (EAST) AND REAR (NORTH) ELEVATIONS (3) CONSTRUCTION OF SOLAR PANELS AND 5 NO. ROOFLIGHTS TO FRONT ROOFS AND 3 NO. ROOFLIGHTS TO REAR ROOFS (4) CONSTRUCTION OF NEW PEDESTRIAN GATE TO SIDE (WEST) BOUNDARY (5) CONSTRUCTION OF NEW WASTE WATER TREATMENT PLANT TO REPLACE THE EXISTING AND ASSOCIATED DRAINAGE (6) ALL ASSOCIATED LANDSCAPING AND SITE DEVELOPMENT WORKS
(1) DEMOLISH SINGLE-STOREY SPLIT LEVEL DETACHED DORMER BUNGALOW AND SINGLE-STOREY SHED TO REAR AND SIDE ON WEST BOUNDARY, (2) CONSTRUCTION OF A REPLACEMENT HOUSE, SINGLE-STOREY TO THE FRONT (SOUTH) AND SIDE (WEST) ELEVATION AND TWO-STOREY TO THE SIDE (EAST) AND REAR (NORTH) ELEVATIONS, (3) CONSTRUCTION OF SOLAR PANELS AND 5 NO. ROOFLIGHTS TO FRONT ROOFS AND 3 NO. ROOF-LIGHTS TO REAR ROOFS, (4) CONSTRUCTION OF NEW PEDESTRIAN GATE TO SIDE (WEST BOUNDARY), (5) CONSTRUCTION OF NEW WASTE-WATER TREATMENT PLANT TO REPLACE THE EXISTING AND ASSOCIATED DRAINAGE, (6) ALL ASSOCIATED SITE LANDSCAPING AND SITE DEVELOPMENT WORKS
CONSTRUCT A DWELLING HOUSE SERVED BY MECHANICAL AERATION UNIT AND POLISHING FILTER AND ALL ASSOCIATED SITE WORKS
(A) RETAIN GARAGE TO THE NORTH OF EXISTING DWELLING HOUSE AS CONSTRUCTED, (B) RETAIN ROOF LIGHTS TO THE SOUTH ELEVATION OF EXISTING DWELLING HOUSE AS CONSTRUCTED, (C) RETAIN EXISTING GARDEN SHED AS CONSTRUCTED AND ALL ASSOCIATED SITE WORKS WITHIN REVISED SITE BOUNDARIES