ARDMALIN, MALIN HEAD, LIFFORD
Proposed development
ERECTION OF A DWELLING WITH ONSITE SEWAGE TREATMENT PLANT, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. A NATURA IMPACT STATEMENT (NIS) HAS BEEN SUBMITTED WITH THIS APPLICATION
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 8 Apr 2024
- Residential units
- 1
- Floor area
- 296.04 m²
Timeline
Application received
13 Feb 2024
Decision due
8 Apr 2024
Decision: refused
5 Apr 2024
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
(1) CONSTRUCTION OF A SINGLE STOREY EXTENSION WITH EXTENSIVE DEMOLITION AND RENOVATIONS TO AN EXISTING SINGLE STOREY DWELLING CONSISTING OF A NEW ENTRANCE HALL WITH AN OPEN PLAN LIVING/KITCHEN/DINING TO THE GROUND FLOOR WITH A UTILITY AND 3 NO. BEDROOMS, ONE WITH EN SUITE AND BATHROOM TOGETHER WITH ASSOCIATED SITE WORKS, (2) CONSTRUCTION OF AN UPGRADED SITE ENTRANCE, LOCATED AT THE EXISTING ENTRANCE AND (3) CONSTRUCTION OF A NEW PROPRIETARY WASTEWATER TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS NECESSARY TO FACILITATE THE DEVELOPMENT
CONSTRUCTION OF A SINGLE STOREY EXTENSION TO AN EXISTING SINGLE STOREY DWELLING CONSISTING OF A NEW ENTRANCE HALL WITH AN OPEN PLAN LIVING/KITCHEN/DINING TO THE GROUND FLOOR WITH A UTILITY AND 3 NO. BEDROOMS, ONE WITH EN SUITE AND BATHROOM TOGETHER WITH ASSOCIATED SITE WORKS, INCLUDING THE CONSTRUCTION OF AN UPGRADED SITE ENTRANCE, LOCATED AT THE EXISTING ENTRANCE, TOGETHER WITH THE CONSTRUCTION OF A NEW PROPRIETARY WASTE WATER TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS NECESSARY TO FACILITATE THE DEVELOPMENT
(1) CONSTRUCTION OF A SINGLE STOREY EXTENSION TO AN EXISTING SINGLE STOREY DWELLING CONSISTING OF A NEW ENTRANCE HALL WITH AN OPEN PLAN LIVING/KITCHEN/DINING TO THE GROUND FLOOR WITH A UTILITY AND 3 NO. BEDROOMS, ONE WITH EN SUITE, AND BATHROOM TOGETHER WITH ASSOCIATED SITE WORKS, (2) CONSTRUCTION OF AN UPGRADED SITE ENTRANCE, LOCATED AT THE EXISTING ENTRANCE AND (3) CONSTRUCTION OF A NEW PROPRIETARY WASTE WATER TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS NECESSARY TO FACILITATE THE DEVELOPMENT
(1) DEMOLITION OF EXISTING DWELLING HOUSE AND (2) CONSTRUCTION OF A REPLACEMENT DWELLING HOUSE WITH CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS
(1) DEMOLITION OF THE EXISTING, DETACHED, DORMER BUNGALOW HOUSE DAMAGED DUE TO DEFECTIVE (MICA) PRECAST CONCRETE BLOCKS AND (2) CONSTRUCTION OF A REPLACEMENT DETACHED, DORMER BUNGALOW HOUSE WITH ALTERATIONS FROM THAT OF THE EXISTING HOUSE AND THE RELEVANT ASSOCIATED REPLACEMENT WORKS TO BE CONNECTED TO THE EXISTING SITE SERVICES
CONSTRUCTION OF A DRY BED AGRICULTURAL SHED AND ALL ASSOCIATED SITE DEVELOPMENT WORKS