Ballymurtagh, Shannon, Co Clare
Proposed development
To construct a new warehouse building which will house mixed use industrial units with office accommodation for industrial light industrial, storage, warehouse and logistic usage including ancillary site works and a stormwater attenuation tank
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- 22 May 2024
Timeline
Application received
29 May 2023
Council asked for further information
20 Jul 2023
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
25 Apr 2024
Decision due
22 May 2024
Decision: conditional
22 May 2024
Grant issued
24 Jun 2024
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for development which will consist of; the construction of advertising on the North elevation of the existing building, including 1.) an advertising billboard of 18.6 sqm and 2.) a cockpit of a plane projecting 3820mm from the façade of the building and all ancillary site works above and below ground
for the development on lands at Shannon Town Centre, Tullyvarraga, Shannon, Co. Clare. The proposed development consists of: Demolition of the existing Discount Foodstore (gross floor area 1,237 sq. m); Construction of a single storey Discount Foodstore comprising a gross floor area of 2,560 sq. m (net retail area 1,742 sq. m including Off-License area of 66 sq. m), incorporating internal plant room, ESB substation, switch room, storage rooms, chiller room and ancillary staff meeting and office rooms; Provision of plant area located on the roof of the Discount Foodstore (61.3 sq. m); Provision of site access via 2 no. existing vehicular junctions at Bóthar na Rinne at the western boundary of the site and Bóthar an Aerfoirt at the northern boundary of the site; Alterations to car parking layout providing 145 no. spaces (including 5 no. disabled spaces, 10 no. child & parent spaces and 2 no. EV charging spaces) and the provision of 36 no. bicycle spaces; Provision of roof mounted solar PV panels (gross floor area 978 sq. m); Erection of 2 no. flagpole mounted (internally illuminated) signs (total area 23.6 sq. m and height of 6m), 5 no. wall mounted (internally illuminated) building signs (total area 31.25 sq. m), 1 no. poster display board (illuminated case) sign (total area 1.7sq. m) and 3 no. billboard signs (externally illuminated) (total area 24 sq. m); All ancillary works required including revised drainage proposals, revised site lighting layout, revised bin cage and storage arrangements, revised trolley bay locations, landscaping, boundary treatments, traffic control measures, HGV/Loading Bay area and all site development works
for the following development on the site, consisting of; construction of a new 47 m2 bunded modular extension including an underground bund, A new external covered solvent storage area and bund, New concrete yard, New access landing, ramp, steps & railings, Removal of an existing LPG tank, and All ancillary site development works and services to facilitate the development including drainage, and utility connections. The proposed development site is controlled by an Industrial Emissions Licence (No. IEL P0020-03) authorised by the Environmental Protection Agency
for development: this application is an amendment to previously approved CCC ref. P24/60422. The development will consist of the installation of a c. 2.4 m high composite fence around the existing compact modular substation, and ancillary site development works
for amendments to previously granted planning permission (Planning Reference: P24/60414) at Ballymurtagh, Shannon Free Zone West, Shannon, Co. Clare. The amendments include: 1. Realignment of the northern site boundary to the north of permitted Building 01; 2. Repositioning and reduction in the floor area of Building 01 (from 3,905 m² to 3677 m²); 3. Increase in the floor area of Building 02 (from 6,010 m² to 6509m²). 4. Reduction in car parking spaces from previously permitted 286 spaces to 285 spaces. 5. Associated site works required to facilitate the above amendments, including adjustments to parking and landscaping, as necessary. The permitted development consists of the construction of two light industrial buildings with ancillary office space, yard areas, refuse stores, car parking, bicycle parking, ESB substations, a switch room, and associated site works. Permission is also sought to retain flexibility in the subdivision of the buildings as follows: Building 01 (Floor area amended from previously granted 3905m² to reduced area of 3,677 m²). Option A: (Amended floor area 3677m²) One unit with ancillary yard and refuse/plant store. Option B: (Amended Unit 01 floor area 1834.5m²), (Amended Unit 02 floor area 1842.5m²), Two units with individual yards and refuse/plant stores. Building 02 (Floor area amended from previously granted 6010m² to increased area of 6,509 m²) Option A: (Amended floor area 6509m²) One unit with ancillary yard and refuse store. Option B: (Amended Unit 01 floor area 4318.5m²), (Amended Unit 02 floor area 2190.5 m²), Two units with individual yards and refuse stores. Option C: (Amended Unit 01 floor area 2176m²), (Amended Unit 02 floor area 2142.4 m²) & (Amended Unit 03 floor area 2190.6 m²), Three units with individual yards and refuse stores.
to make amendments to a previous granted planning Ref No. P21-738 which included (1) Demolition of an existing bungalow (2) Construct a new ESB Substation and (3) Construct mixed use industrial units with office accommodation for industrial, light industrial, storage, warehouse and logistic usage including ancillary siteworks all at Western Business Park, Caherteige and Drumgeely Shannon, Co Clare. The amendments to the previous granted planning include the following: (a) relocating the ESB substation from the eastern elevation of Unit 7 to the western elevation of Unit 6, (b) revising the internal layout and elevation of Unit 6 and raising the height of Unit 6 from 16.4m OD to 18.4m