Ballyartney Ballygeery East Ballygeery West, Cullenagh KilKerin Killofin, Knockphutteen and Lakyle North Co Clare
Proposed development
For development in the townlands of Ballyartney, Ballygeery East, Ballygeery West, Cloonkerry West, Cullenagh, KilKerin, Killofin, Knockphutteen and Lakyle North, Co Clare. The proposed development will include; (1) An extension of the existing Kilkerin Point 220 kV Line Cable Interface Mast (LCIM) compound, to facilitate new electrical equipment for the connection of two new 220 kV cable circuits, including: (a) A new control cabin (approximately 13.4sqm floor area by 3.5m high, which includes 0.85m ground clearance) and 2 no. parking spaces; (b) Associated 220 kV electrical equipment including, cable sealing ends, insulators, overhead conductors, surge arrestors and lightning masts measuring 15m high (tallest compound structure); (c) 220 kV underground cabling from the associated underground transition pits to the cable sealing end equipment; palisade fencing (approximately 2.6m in height, up to 3.5m in height, including anti-climb device) and gates; and associated landscaping. The development will also comprise; (2) A new fibre optic cable measuring an approximate length of 8.9km routed between Kilkerin Point LCIM compound (townland of Lakyle North) and Prospect 220 kV substation (townland of Ballygeery West); (3) Decommissioning of existing 220 kV electrical equipment, security fencing and gate at Kilkerin Point 220 kV compound; and (4) All ancillary site development works including site preparation works, site clearance and levelling, hardstanding, internal access tracks and temporary construction compound. This planning application is accompanied by a Natura Impact Assessment (NIS)
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- 14 Dec 2023
Timeline
Application received
31 Mar 2023
Council asked for further information
24 May 2023
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
28 Sept 2023
Decision due
14 Dec 2023
Decision: conditional
13 Dec 2023
Grant issued
29 Jan 2024
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
to construct a storage shed/private garage with a solid fuel storage area along with all associated works
to construct a private garage with solid fuel storage area along with all associated works